background image

/ Perfect Charging / 

Perfect Welding

 / Solar Energy

42,0426,0286,EA 003-11052018

OPT/i TWIN SyncBox

Operating Instructions

Robot option

EN-US

Содержание OPT/i TWIN SyncBox

Страница 1: ...Perfect Charging Perfect Welding Solar Energy 42 0426 0286 EA 003 11052018 OPT i TWIN SyncBox Operating Instructions Robot option EN US...

Страница 2: ...2...

Страница 3: ...oduct Reading the instructions carefully will enable you to learn about the many different features your Fronius product has to offer This will allow you to make full use of its advan tages Please als...

Страница 4: ...4...

Страница 5: ...ly 7 Environmental Conditions 7 Technical Data 7 Notes on the function of the OPT i TWIN SyncBox 8 Indications on OPT i TWIN SyncBox 9 Indications on OPT i TWIN SyncBox 9 Application example 10 Applic...

Страница 6: ...6...

Страница 7: ...nal transmission Under no circumstances may safety related sig nals be transmitted via the OPT i TWIN SyncBox CAUTION Equipment can be severely damaged if operated or stored outside of stipulated envi...

Страница 8: ...source Troubleshooting The OPT i TWIN SyncBox does not have a troubleshooting function an error in power source 1 would therefore not automatically affect deactivate power source 2 Cooling For the wel...

Страница 9: ...ED Heartbeat Staus Meaning Off Offline no supply voltage Flashing green The PC board operating system is working properly 2 LED Synchronisation Staus Bedeutung Lights up green power sources are synchr...

Страница 10: ...10 Application example Application Ex ample...

Страница 11: ...following settings on the control panel of power source 2 Select Defaults System Next Page TWIN Setup Power Source 2 Set Process Parameters Components Monitoring Components Cooling Unit Operating Mode...

Страница 12: ...1 A 4600 Wels Austria Tel 43 0 7242 241 0 Fax 43 0 7242 241 3940 E Mail sales fronius com www fronius com www fronius com addresses Under http www fronius com addresses you will find all addresses of...

Отзывы: