![Fronius DeltaSpot G2 Скачать руководство пользователя страница 56](http://html1.mh-extra.com/html/fronius/deltaspot-g2/deltaspot-g2_operating-instructions-and-spare-parts-list_2339382056.webp)
56
Procedure for process tape brakes that are too tight:
1.
Turn the screw clockwise by half a turn (- direction)
2.
Manually feed in a short section of process tape
3.
Check that the process tape brake is set correctly. If not, repeat steps 1 and 2
Replacing elec-
trodes
Switch off the coolant supply
CAUTION!
Danger of burns from hot coolant.
Before changing the electrodes, turn off the coolant supply.
1
2
3
4
1
3
4
5
6
Содержание DeltaSpot G2
Страница 2: ...2 ...
Страница 4: ...4 ...
Страница 14: ...14 ...
Страница 15: ...General information ...
Страница 16: ......
Страница 20: ...20 ...
Страница 25: ...Control elements and connections ...
Страница 26: ......
Страница 35: ...Start up ...
Страница 36: ......
Страница 42: ...42 Threading the process tape Threading the process tape at the top 2 3 4 5 6 3 4 5 6 7 ...
Страница 43: ...43 EN Threading the process tape at the bottom 7 8 9 10 8 9 10 11 ...
Страница 45: ...Spot welding ...
Страница 46: ......
Страница 50: ...50 ...
Страница 51: ...Troubleshooting and maintenance ...
Страница 52: ......
Страница 58: ...58 3 4 Lower gun arm 1 2 3 3 4 1 2 3 ...
Страница 63: ...Appendix ...
Страница 66: ...66 DRPDS1 0 RemoteControl PRO VSHFLI OHQJWK 4 300 006 ...