Fröling Lambdatronic S 3100 Скачать руководство пользователя страница 18

Control Sy

stem  

Lamb

datro

nic S 3100 

 

SERVICE INSTRUCTIONS 

 

FRÖLING Heizk

essel und Be

hälterbau

 GmbH 

 

B 018 10 04 

A-4710 Grieskirchen, Industriestr

aße 12, 

Tel.: +43 (0)724

8/606-0

  

Page 19 of 

24

 

 

9 Connection 

instructions 

 

Please follo

w the con

nection i

nstructions b

elo

w. 

 

9.2 Mains  connection 

 

 

 

 

 

 

 

 

L, N, PE... 

feed for the w

hol

e control, cab

le 

widt

h 1.5 mm² 

L1... remains 

free 

 

9.3 

Heating circuit pumps for underfloor or wa

ll heating 

 

In addition to the temper

ature limit b

y th

e contro

l, the following is re

quired 

for safety reas

ons: 

flow

 co

ntact th

ermostat 

must also be co

nnected u

pstrea

m of 

the respective heati

ng circuit pump. 

 

 

9.4 

Jumper setting for actuators 

 

The jumpers o

n the mother

board 31

00 must be ad

justed to the t

ype

 of actuator in the 

air damp

ers: 

 

Actu

ator 

Jump

ers on

 moth

erbo

ard

 3100 

with

out feedb

ack 3 terminals 

on motor 

Do not set JP1, JP2  

with

 feedback 

6 terminals on 

motor 

Set JP1, JP2  

 

 

Both actuators must be the sa

me typ

e. 

 

Note “Actuator w

ith

 feedback" 

parameter in “

Sys

tem selecti

on"! 

9.5 

Jumper setting for solar control 

 

With the solar 

control the mixer 3 and mi

xer 4 outputs are u

sed as pum

p outputs.  

The jumpers o

n e

xpa

nsion bo

ard 2 must be 

set as show

n in the tabl

e: 

 

Jump

ers on

 expan

sion

 board

 2 

System

 

Set JP1  

12,13,14 

Set JP2  

12,14 

 

 

 JP1 and JP2 on e

xpa

nsion bo

ard 2 must not be set w

itho

ut a solar co

ntrol (for mixer dr

ive). 

Feed cab

le 

L1

PE

N

L

Lambdatronic 

3100

 

remains free 

Содержание Lambdatronic S 3100

Страница 1: ...NG 4 PUMPE 1 PUMPE 2 PUMPE 3 GEBL SE EINGABE 0 A HEIZUNG 1 PUMPE HZG 0 L GEBL SE 2 3 4 1 2 3 2 3 4 5 6 7 8 9 1 1 Two line display 2 Menu buttons 3 Button Start Stop 4 Status LED 5 Operating display fo...

Страница 2: ...e instructions and advice could cause damage to the appliance and personal injury Main switch RISK Never stop the boiler using the main switch Do not stop burn off The main switch may only be activate...

Страница 3: ...ments The system is operated using a 4 button control unit with a clear menu structure All of the parameters necessary for operation are at the customer s disposal ZUR C ZUR CK EINGABE Feuer Aus Kesse...

Страница 4: ...er value The value can now be changed 4 Change the value The up arrow key increases the value The down arrow key decreases the value Changing parameters and values 5 Confirm with the Enter key EINGABE...

Страница 5: ...child lock or 1 for customer confirm by pressing Enter If you enter the wrong code the code for child lock will automatically be used User code The name of the set user level will appear briefly Off...

Страница 6: ...prog 1 Enter Back Heating phase1 start Heating phase1 end Heating phase2 start Heating phase2 end Heating prog 2 Heating prog 14 same as heating prog 1 Heating circuit 1 Enter Back Heating curve Ente...

Страница 7: ...en the set temperature is reached in the DHW the DHW loading pump switches off Set DHW temp 2 55 When the set temperature is reached in the DHW the DHW loading pump 2 switches off Reload if boiler und...

Страница 8: ...ue during the drawdown phase is only visible with remote control Flow temperature reduction 15 The flow temp is reduced by this value in the drawdown phase Ex temp heating limit 18 If the outside temp...

Страница 9: ...limination of the error has been acknowledged by pressing the ENTER key the status LED returns to green Chapter 7 2 Error message list contains a list of possible error messages 7 Troubleshooting What...

Страница 10: ...per closed On actuator swap connection for left with right Check dampers can turn Check cable and connection Storage temp low RELOAD W Top storage tank temperature insufficient for heat supply Info on...

Страница 11: ...heating times here Heating phase 1 Heating phase 2 Heating phase 1 Heating phase 2 Start End Start End Start End Start End Heating prog 1 Heating prog 8 Heating prog 2 Heating prog 9 Heating prog 3 He...

Страница 12: ...g session 14 00 End of the second loading session 16 00 Heat only once day N Legionella heating65 Y Legionella heating day Sat Solar Set hot water temp 55 Heating circuit 1 Flow temp at outer 10 C 60...

Страница 13: ...Lambdatronic S 3100 Control System SERVICE INSTRUCTIONS B 018 10 04 FR LING Heizkessel und Beh lterbau GmbH Page 24 of 24 A 4710 Grieskirchen Industriestra e 12 Tel 43 0 7248 606 0 Notes...

Страница 14: ...bdatronic S 3100 SERVICE INSTRUCTIONS FR LING Heizkessel und Beh lterbau GmbH B 018 10 04 A 4710 Grieskirchen Industriestra e 12 Tel 43 0 7248 606 0 Page 23 of 24 10 List of parameter changes Paramete...

Страница 15: ...ng circuit pump 0 or as an oil boiler contact depending on the system settings Connecting a HCP 0 up to 2 Ampere Connecting a HCP 0 up to 5 Ampere External feed Connection as an oil boiler contact NOT...

Страница 16: ...not be longer than 20 m Console RBG 3100 also includes a room sensor which sends the current room temperature to the control Note RXD and TXD must be crossed over RXD on TXD TXD on RXD 9 10 PC Visuali...

Страница 17: ...6 pin 9 7 Flue gas sensor 9 8 Remote control The remote control also contains a room sensor which sends the current room temperature to the control Switch settings Override circuit ignores the reduct...

Страница 18: ...eating circuit pump 9 4 Jumper setting for actuators The jumpers on the motherboard 3100 must be adjusted to the type of actuator in the air dampers Actuator Jumpers on motherboard 3100 without feedba...

Страница 19: ...RC 3 Remote control 3 RC 4 Remote control 4 FS 3 Flow sensor 3 FS 1 Flow sensor 1 ES 1 External sensor 1 FS 2 Flow sensor 2 RC 1 1 Remote control RC 2 Remote control 2 Mixer 3 Mixer 1 Mixer 4 Mixer 2...

Страница 20: ...or 3 Sensor 2 Sensor 1 Sensor 4 Sensor 5 HCP 0 N PE1 PE2 A W H A A HCP oil Lambda board 3100 optional View of bottom level Control element 3100 Flat ribbon cable to expansion board 1 Flat ribbon cable...

Страница 21: ...onnection for left with right Check dampers can turn Check cable and connection Storage temp low RELOAD W Upper storage tank temperature insufficient for heat supply Info only no error automatic ackno...

Страница 22: ...will need to set the secondary air by way of an emission measurement using the Sec air MAX parameter in the air settings If you have a Lambda control it is recommended you carry out an emissions measu...

Страница 23: ...hecking the door sensor switch Door sensor A 0 door closed switch activated A 1 door open switch not activated If the insulating door is open the ID fan will start up 6 7 Checking the tightness and sy...

Страница 24: ...Press the Enter button A question mark will appear Now enter the code for the Installer or Service user level Confirm by pressing Enter If you enter the wrong code the code for child lock will automat...

Страница 25: ...Please note that heating circuits 1 and 3 can be used for solar element 5 8 2 System parameters The actual number of parameters of those listed below depends on the system settings Bypass pump av Yes...

Страница 26: ...bda probe is available FHG Turbo 30 FHG Turbo 40 Comb chamb sensor av N Y if a combustion chamber sensor is available FHG Turbo 50 FHG Turbo 70 Actuator with feedback N Y Actuators with feedback have...

Страница 27: ...PEN A 0 Primary air damper OPEN Prim fl CLOSED A 0 Primary air damper CLOSED Sec fl OPEN A 0 Secondary air damper OPEN Sec fl CLOSED A 0 Secondary air damper CLOSED A 0 Automatic OFF A AUTOMATIC A 1 A...

Страница 28: ...pressing the ENTER key Short red flashes Warning or error persists not acknowledged Long red flashes Warning or error persists but acknowledged Warning The status LED automatically changes to green as...

Страница 29: ...e flue gas temperature Top load point to ensure adequate efficiency if this temperature is exceeded the output will be reduced Flue gas temp start add 20 Flue gas target value increase when heating up...

Страница 30: ...each like heating prog 1 You can program up to 14 heating times each with two heating phases These are assigned to the individual days of the week in the parameter Heating circuit 1 4 weekly program...

Страница 31: ...switched off Oil boiler Oil boiler storage temp diff 10 The minimum temperature difference between the oil boiler and storage tank which releases the oil boiler loading pump output Oil boiler start d...

Страница 32: ...rage temp diff 10 Temperature difference for launching storage tank loading process Residual heat use N This function can only be used in conjunction with a bypass pump return feed mixer The residual...

Страница 33: ...iler temperature is exceeded by a set value the status of the boiler will be maintained glow Once the temperature goes back down below the target boiler value the boiler s status will return to heatin...

Страница 34: ...100 Mixer Ty 240s ID fan 36 Solar Primary air 76 ERROR DISPLAY Heating times Prim damp pos 77 Heating circuit 1 O2 content 7 9 Heating circuit 2 O2 controller 78 Heating circuit 3 Sec air 77 Sec damp...

Страница 35: ...ontrol 17 9 Connection instructions 19 9 2 Mains connection 19 9 3 Heating circuit pumps for underfloor or wall heating 19 9 4 Jumper setting for actuators 19 9 5 Jumper setting for solar control 19 9...

Страница 36: ...UMPE 2 PUMPE 3 GEBL SE EINGABE 0 A HEIZUNG 1 PUMPE HZG 0 L GEBL SE 2 3 4 1 2 3 1 Two line display 2 Menu buttons 3 Button Start Stop 4 Status LED 5 Operating display for pumps 6 Fan 7 Switch heater 0...

Отзывы: