FBM-FOBBLES-F8-PRO User Manual
8
4.5.2
Rigging
Using the following general guidelines when mounting this product:
•
Before deciding on a location for the product, make sure there is easy access to the product for maintenance and programming
purposes.
•
Make sure that the structure or surface onto which you are mounting the product can support the product’s weight (see the Technical
Specifications).
•
When mounting the product on the floor, make sure that the product and cables are away from people and vehicles.
5
OPERATION
5.1
Preparing for Operation
•
After checking that all the parts are intact and complete, position the machine on flat surface.
•
Withdraw the fluid tanks from their compartments and remove the caps. Add bubble fluid and fog fluid to their respective tanks.
•
Verify that the plastic hoses attached to the cap are in place and in good condition without crimps.
•
Always connect the product to a grounded circuit. Before powering on, make sure it is supplied with the rated voltage.
•
Turn on the machine, and “Warming up” shows on the display during the heating-up process. After approx. 3 minutes, the display
changes to “Ready to work” when the machine finishes heating.
5.2
On-device Control Mode & Operation
To access the control panel functions, use the four buttons located underneath the LCD display.
Button
Function
MENU
Switch menu pages to select a function
▲
TIMER
Increases the numeric value of current function
Trigger TMER output mode