1.
Put on the lid and secure it in place with the 4 hexagon screws!
2.
Apply the transmitter with seal (5)!
3.
Tighten the hexagon screws crosswise with a torque spanner (1)
until it disengages! To be on the safe side, re-tighten all screws
again after initially tightening them. All screws are secured against
becoming loose during the grinding process once they have been
tightened with the torque spanner as described.
Fritsch GmbH assumes no guarantee for damage
caused by grinding with loose screws!
4.
Switch on the transmitter with the On/Off button (A) (LED flashes
blue) and place the support ring on the bowl. Now position the
bowl with the EGTM system as described in Chapter "Clamping the
grinding bowls".
NOTICE!
Check the fitting of the transmission unit again
after inserting the bowl!
NOTICE!
You must check that the hexagon screws are sit-
ting correctly during breaks in grinding. If screws
have loosened, they must be re-tightened.
EASY GTM Gas Pressure and Temperature Measuring System
- 11 -