Page 18
GLBM188HB
8 – 3
8. Run the oven and check all functions.
[7] G: PRIMARY INTERLOCK SYSTEM TEST
1. DOOR SENSING SWITCH
1. Disconnect the power supply cord, and then remove outer case.
2. Open the door and block it open.
3. Discharge high voltage capacitor.
4. Isolate the switch and connect the ohmmeter to the common (COM.) and normally open (NO) terminal of the switch. The meter should indicate an
open circuit with the door open and a closed circuit with the door closed. If improper operation is indicated, replace the door
sensing switch.
5. Reconnect all leads removed from components during testing.
6. Reinstall the outer case (cabinet).
7. Reconnect the power supply cord after the outer case is installed.
8. Run the oven and check all functions.
NOTE: NOTE: If the door sensing switch contacts fail in the open position and the door is closed, the cooling fan motor, stirrer motor and oven light
will be activated by RY1.
2. PRIMARY INTERLOCK RELAY (RY2)
1. Disconnect the power supply cord, and then remove outer case.
2. Open the door and block it open.
3. Discharge high voltage capacitor.
4. Disconnect two (2) wire leads from the male tab terminals of the Primary Interlock Relay. Check the state of the relay contac
ts using a ohmmeter.
The relay contacts should be open. If the relay contacts are closed, replace the circuit board entirely or the relay itself.
5. Reconnect all leads removed from components during testing.
6. Reinstall the outer case (cabinet).
7. Reconnect the power supply cord after the outer case is installed.
8. Run the oven and check all functions.
[8] H: MONITOR SWITCH TEST
1. Disconnect the power supply cord, and then remove
outer case.
2. Open the door and block it open.
3. Discharge high voltage capacitor.
4. Before performing this test, make sure that the second-
ary interlock switch and the primary interlock relay are
operating properly, according to the above Switch Test
Procedure. Disconnect the wire lead from the monitor
switch (COM) terminal. Check the monitor switch opera-
tion by using the ohmmeter as follows. When the door is
open, the meter should indicate a closed circuit. When
the monitor switch actuator is pushed by a screw driver
through the lower latch hole on the front plate of the oven cavity with the door opened (in this condition the plunger of the m
onitor switch is pushed
in), the meter should indicate an open circuit. If improper operat
ion is indicated, the switch may be defective. After testing
the monitor switch,
reconnect the wire lead to the monitor switch (COM) terminal and check the continuity of the monitor circuit.
5. Reconnect all leads removed from components during testing.
6. Reinstall the outer case (cabinet).
7. Reconnect the power supply cord after the outer case is installed.
8. Run the oven and check all functions.
[9] I: BLOWN MONITOR FUSE TEST
1. Disconnect the power supply cord, and then remove outer case.
2. Open the door and block it open.
3. Discharge high voltage capacitor.
4. If the monitor fuse is blown when the door is opened, check the secondary interlock switch, primary interlock relay (RY2), relay (RY1) and monitor
switch according to the “TEST PROCEDURE” for those switches before replacing the blown monitor fuse.
CAUTION: BEFORE REPLACING A BLOWN MONITOR FUSE, TEST THE SECONDARY INTERLOCK SWITCH, PRIMARY INTERLOCK RELAY,
DOOR SENSING SWITCH AND MONITOR SWITCH FOR PROPER OPERATION.
SCREW
DRIVER
Black
White/ Gray
MONITOR
SWITCH
SECONDARY
INTERLOCK
SWITCH
OHMMETER