background image

11

GAS CONNECTION

1.  Remove the shipping cap from gas pipe at the rear of

the dryer.

NOTE: DO NOT

 connect the dryer to L.P. gas service

without converting the gas valve. An L.P.
conversion kit must be installed by a qualified gas
technician.

2.  Connect a 1/2 inch (1.27 cm) I.D. semi-rigid or approved

pipe from gas supply line to the 3/8 inch (0.96 cm) pipe
located on the back of the dryer (see pages 6 and 7).
Use a 1/2 inch to 3/8 inch (1.27 cm to 0.96 cm) reducer
for a connection. Apply an approved thread sealer that
is resistant to the corrosive action of liquefied gases on
all pipe connections.

3.  Open the shutoff valve in the gas supply line to allow

gas to flow through pipe.

4.  Test all connections by brushing on a soapy water

solution. 

NEVER test for gas leaks with an open

flame.

GENERAL INSTALLATION

1. Connect the exhaust duct to outside exhaust system

(see pages 3 and 4).  Use duct tape to seal all joints.

2. With the dryer in its final position, adjust one or more of

the legs until the dryer is resting solid on all four legs.
Place a level on top of the dryer.

 The dryer MUST be

level and resting solid on all four legs.

3. Plug the power cord into a grounded outlet. NOTE:

Check to ensure the power is off at circuit breaker/fuse
box before plugging the power cord into the outlet.

4. Turn on the power at the circuit breaker/fuse box.

 

Before operating the dryer, make sure the

dryer area is clear and free from combustible materials,
gasoline, and other flammable vapors. Also see that
nothing (such as boxes, clothing, etc.) obstructs the
flow of combustion and ventilation air.

5. Run the dryer through a cycle check for proper

operation.

NOTE:

  On gas dryers, before the burner will light, it is

necessary for the gas line to be bled of air. If the
burner does not light within 45 seconds the first
time the dryer is turned on, the safety switch will
shut the burner off. If this happens, turn the timer
to "OFF" and wait 5 minutes before making another
attempt to light.

6. If your dryer does not operate, please review the "Avoid

Service Checklist" located in your Use and Care Guide
before calling for service.

7. Place these instructions in a location near the dryer for

future reference.

NOTE:

A wiring diagram is located inside the dryer
console or under the top panel.

REPLACEMENT PARTS

If replacements parts are needed for your dryer, contact the
source where you purchased your dryer, call 1-800-944-9044,
or visit our website, www.frigidaire.com, for the Frigidaire
Company Authorized Parts Distributor nearest you.

 Label all wires prior to disconnection when

servicing controls. Wiring errors can cause improper and
dangerous operation. Verify proper operation after servicing.

 Destroy the carton and plastic bags after

the dryer is unpacked. Children might use them for play.
Cartons covered with rugs, bedspreads, or plastic sheets
can become airtight chambers causing suffocation. Place
all materials in a garbage container or make materials
inaccessible to children.

 The instructions in this manual and all other

literature included with this dryer are not meant to cover
every possible condition and situation that may occur.
Good safe practice and caution 

MUST

 be applied when

installing, operating and maintaining any appliance.

VALVE OPEN / GAS FLOW POSITION

Содержание FEFB9200ES0

Страница 1: ...nts 2 Electrical Requirements 2 Exhaust System Requirements 3 4 Gas Supply Requirements 4 Location of Your Dryer 4 5 Rough In Dimensions 6 Mobile Home Installation 7 Unpacking 7 Reversing Door Swing 7 8 Electrical Installation 9 Grounding Requirements 9 Electrical Connections 3 wire 10 Electrical Connections 4 wire 10 Gas Connection 11 General Installation 11 Replacement Parts 11 Requerimientos de...

Страница 2: ...ctors with upturned ends or closed loop connectors and marked for use with clothes dryers See ELECTRICAL CONNECTIONS for additional instructions OUTLET RECEPTACLE NEMA 10 30R 3 wire receptacle or NEMA 14 30R 4 wire receptacle to be located so the power supply cord is accessible when the dryer is in the installed position GAS Dryer CIRCUIT Individual 15 amp branch circuit fused with a 15 amp maximu...

Страница 3: ...e dwelling Do not allow combustible materials for example clothing draperies curtains paper to come in contact with exhaust system The dryer MUST NOT be exhausted into a chimney a wall a ceiling or any concealed space of a building which can accumulate lint resulting in a fire hazard Exceeding the length of duct pipe or number of elbows allowed in the MAXIMUM LENGTH charts can cause an accumulatio...

Страница 4: ...3 1 2 13 1 2 13 1 2 13 1 2 13 1 2 34 cm 34 cm 34 cm 34 cm 34 cm 3 3 4 3 3 4 3 3 4 3 3 4 3 3 4 9 5 cm 9 5 cm 9 5 cm 9 5 cm 9 5 cm 3 3 4 3 3 4 3 3 4 3 3 4 3 3 4 9 5 cm 9 5 cm 9 5 cm 9 5 cm 9 5 cm 2 The gas supply line should be of 1 2 inch 1 27 cm pipe 3 If codes allow flexible metal tubing may be used to connect your dryer to the gas supply line The tubing MUST be constructed of stainless steel or ...

Страница 5: ...quare centimeters 3 inches 7 6 cm from bottom and top of door NOTE Under counter and stack models 0 inches 0 cm for sides rear and top This dryer MUST be exhausted outdoors 5 The following illustrations show minimum clearance dimensions for proper operation in a recess or closet installation CLOSET DOOR 60 sq inches 387 1 sq cm 15 38 1 cm 0 0 cm 60 sq inches 387 1 sq cm 1 2 54 cm 0 0 cm 0 0 cm 0 0...

Страница 6: ...t 13 5 27 25 to front of cabinet 27 75 to clear knobs 28 5 to clear door handle 5 875 To base exhaust 5 0 4 375 To side exhausts To rear base exhausts 2 25 2 375 Gas supply pipe on rear of unit Electrical supply on rear of unit 123 19cm 72 39cm 12 7cm 11 12cm 14 93cm 69 22cm 70 49cm 72 39cm 5 72cm 6 03cm 68 58cm 34 29cm 36 91 44cm Dryer Installation Dimensions Free Standing Under Counter Stacked D...

Страница 7: ... 2 and 3 for other important venting requirements 6 Installation MUST conform to current Manufactured Home Construction Safety Standard which is a Federal Regulation Title 24 CFR Part 32 80 or when such standard is not applicable with American National Standard for Mobile Homes The dryer is designed under ANSI Z 21 5 1 or ANSI UL2158 CAN CSA C22 2 latest editions for HOME USE only FOAM SHIPPING PA...

Страница 8: ...remove the plugs Be careful to avoid scratching the paint 5 Remove the two handle screws and remove the handle by pulling straight out from door 6 Install the plugs from Step 3 into the holes left by removing the handle screws in Step 4 7 Lay the door on a flat surface and support the edges of the door to keep it from turning Apply moderate downward pressure on the lens with both hands and rotate ...

Страница 9: ...rd resulting in electrical shock Do not use an aluminum wired receptacle with a copper wired power cord and plug or vice versa A chemical reaction occurs between copper and aluminum and can cause electrical shorts The proper wiring and receptacle is a copper wired power cord with a copper wired receptacle NOTE Dryers operating on 208 volt power supply will have longer drying times than operating o...

Страница 10: ...ng the terminal block access cover and the strain relief mounting bracket located on the back of the dryer upper corner 2 Install a U L approved strain relief into the power cord entry hole of the mounting bracket Finger tighten the nut only at this time 3 Thread a U L approved 30 amp power cord NEMA 10 30 type SRDT through the strain relief 4 Attach the power cord neutral center wire conductor to...

Страница 11: ...ructs the flow of combustion and ventilation air 5 Run the dryer through a cycle check for proper operation NOTE On gas dryers before the burner will light it is necessary for the gas line to be bled of air If the burner does not light within 45 seconds the first time the dryer is turned on the safety switch will shut the burner off If this happens turn the timer to OFF and wait 5 minutes before m...

Отзывы: