background image

Содержание CRA050XT73

Страница 1: ...ON INSTRUCTIONS for future reference The carton is the best way to store unit during winter or when not in use DO NOT USE ANY SCREWS OTHER THAN THOSE SPECIFIED HERE FOR SAFETY REASONS THE TOP RAIL MUST BE SECURELY FASTENED WITH ALL FOUR 4 SCREWS Some assembly is required Please read these instructions carefully Top Rail Hardware Qty 3 8 Screw 4 Top Rail 1 f Qty Mounting Hardware 3 4 screws lock fr...

Страница 2: ...Slide the top and bottom ends of the frame into the top and bottom rails of the cabinet See FIG 3 D Slide the panel all the way in and repeat on the other side FIG 1 FIG 2 T section FIG 3 Top Rail 7 r _ JJ it J_ Your air conditioner is designed to install in standard double hung windows with opening widths of 23 to 36 inches 584 mm to 914 mm FIG 4A _ FIG 4B Lower sash must open sufficiently to all...

Страница 3: ...ll as shown FIG 8A for wooden windows FIG 8B for Vinyl Clad windows FIG 8A FIG 8B wooden windows Drive locking screws Vinyl Clad windows A For wooden windows Drive 3 4 19 mm locking screws through the frame lock and into the sill FIG 9A NOTE To prevent window sill from splitting drill 1 8 3mm pilot holes before driving screws Drive 3 4 19 mm locking screws through frame holes into window sash FIG ...

Страница 4: ...2A o OUTSIDE 1 4 1 2 I Rail Wooden Window I FIG 12B INSIDE e 5 OUTSIDE H2 about 1 4 1 2 H 1_ _ ___Bottom Rail Vinyl Clad Window Trim the weather seal 6 X3 4 X1 12 with a proper length peel off the protective backing and plug any gaps if needed as shown FIG 13 Removing the air conditioner From Window Turn the air conditioner off and disconnect power cord Remove sash seal from between windows and un...

Отзывы: