background image

13

920-087-04 (8-05)

A. Electrical Rating Tables

All 230/208 volt units are equipped with power cords. See Appendix B on page 19 for wiring in struc tions on 265V units.

NOTE:  Use Copper Conductors ONLY.  Wire sizes are per NEC, check local codes for over seas ap pli ca tions.

WIRE SIZE

Use  ONLY  wiring  size  recommended  for 
single outlet branch circuit.

FUSE/CIRCUIT 
BREAKER

Use ONLY type and size fuse or HACR cir-
cuit breaker indicated on unit’s rating plate. 
Proper current protection to the unit is the 
responsibility of the owner. NOTE: A time 
delay fuse is provided with 265V units.

GROUNDING

Unit MUST be grounded from branch circuit 
through service cord to unit, or through sep-
arate ground wire provided on permanently 
connected units. Be sure that branch circuit 
or general purpose outlet is grounded. The 
fi eld supplied outlet must match plug on 
service cord and be within reach of service 
cord. Refer to Table 1 for proper receptacle 
and fuse type. Do NOT alter the service cord 
or plug. Do NOT use an extension cord.

RECEPTACLE

The fi eld supplied outlet must match plug on 
service cord and be within reach of service 
cord. Refer to Table 1 for proper receptacle 
and fuse type. Do NOT alter the service cord 
or plug. Do NOT use an extension cord.

WIRE SIZING

Use recommended wire size given in Table 
2 and install a single branch circuit. All wiring 
must comply with local and national codes. 
NOTE: Use copper conductors only.

B. Power Cord Information (230/208V models only)

All Friedrich 230/208V PTAC units are shipped from the factory with 
a Leakage Current Detection Interrupter (LCDI) equipped power 
cord. The LCDI device meets the UL and NEC requirements for 
cord connected air conditioners effective August 2004.

To test your power supply cord:

1.  Plug power supply cord into a grounded 3 prong outlet.

2.  Press RESET.

3.  Press TEST (listen for click; Reset button trips and pops out).

4. Press and release RESET (listen for click; Reset button 

latches and remains in). The power supply cord is ready for 
operation.

ELECTRIC SHOCK HAZARD!

  

Turn off electric power before service or installation. 

All electrical connections and wiring 

MUST

 be installed by a qualifi ed electrician and 

conform to the National Electrical Code and all local codes which have jurisdiction. 
Failure to do so can result in property damage, personal injury and/or death.

   HACR – Heating, Air Conditioning, Refrigeration

*   May be used for 15 Amp applications if fused for 15 Amp

   NOTE: 265 volt units are hard wired.

Table 1                250 V Re cep ta cles and Fuse Types

AMPS

15

20*

30

RECEPTACLE

TIME-DELAY TYPE FUSE
(or HACR circuit breaker)

15

20

30

   AWG – American Wire Gauge 

*   Single circuit from main box
** Based on copper wire, single in su lat ed conductor at 60°C

Table 2               Recommended branch circuit wire sizes*

NAMEPLATE / MAXIMUM 

CIRCUIT BREAKER SIZE

AWG  WIRE SIZE**

15
20
30

14
12
10

NOTE: The LCDI device is not intended to be used as a switch.

Once plugged in the unit will operate normally without the need to 
reset the LCDI device. If the LCDI device trips and requires resetting 
the cause of the trip should be identifi ed prior to further use of the 
PTAC.

If the device fails to trip when tested or if the power supply cord is 
damaged it must be replaced with a new supply cord obtained from 
the product manufacturer, and must not be repaired.

Figure 10b

30A LCDI Device

15/20A LCDI Device

Figure 10a

TEST

RESET

Test Button

Reset Button

2"

4.1"

Test Button

Reset Button

7"

2"

Содержание 920-087-04 (3-05)

Страница 1: ...920 087 04 8 05 PTAC PACKAGED TERMINAL AIR CONDITIONERS HEAT PUMPS Standard Control Remote Thermostat Seacoast Protected INSTALLATION OPERATION GUIDE...

Страница 2: ...Installation 14 15 Digital Control User Input Con guration 16 Operation 17 Remote Thermostat and Low Voltage Control Connections 18 Desk Control Terminals 19 Auxiliary Fan Control 19 Fresh Air Vent C...

Страница 3: ...al Please read this manual thoroughly prior to equipment installation or operation It is the installer s responsibility to properly apply and install the equipment Installation must be in conformance...

Страница 4: ...PTAC units should be installed no closer than 12 apart when two units are side by side If three or more PTAC units are to operate next to one another allow a minimum of 36 between units Also a vertic...

Страница 5: ...riedrich digital PTAC features a self diagnostic program that can alert maintenance to component failures or operating problems The internal diagnostic program saves properties valuable time when diag...

Страница 6: ...pressor is diabled and the fan continues to operate based on demand Once the coil temperature returns to 45 F the compressor returns to operation Ultra QuietAirSystem The new Friedrich PD series units...

Страница 7: ...rvinylhose obtained locally toconnecttheinternaldraintubetothedrainsystem in the building 6 Referring to Detail A on page 6 locate and assemble the 2 two cover plates and gaskets over the drain holes...

Страница 8: ...ting plate with the ange toward the wall sleeve 3 Attach the drain tube assembly to one of the two drain holes at the rear of the wall sleeve The large ange on the mounting plate is positioned at the...

Страница 9: ...rds the outside to facilitate condensate drainage It should be level side to side and the front should be 1 4 bubble higher than the back DO NOT allow any pitch toward the inside Electrical shock haza...

Страница 10: ...onstruct wall opening to comply with all applicable building codes Main studs Jack studs Main studs Jack studs Lintel Mounting screw holes No holes in bottom of wall sleeve unless drain kit is used 5...

Страница 11: ...roper fabrication or installation of a wall sleeve extension will impair PTAC performance Extension Installation Secure the wall sleeve extension to the wall sleeve before installing it in the wall Re...

Страница 12: ...ached to the grille and an anchor point inside the building during installation Installation Instructions Model PXGA Standard Grille 5 Grasp the grille by the attached plastic handles Position it with...

Страница 13: ...I device meets the UL and NEC requirements for cord connected air conditioners effective August 2004 To test your power supply cord 1 Plug power supply cord into a grounded 3 prong outlet 2 Press RESE...

Страница 14: ...essor Chassis shipping bracket Shipping pallet IMPORTANT When installing a Friedrich P Series PTAC into an existing sleeve it is important to ensure that the unit is installed completely Inspection of...

Страница 15: ...e screws into the clips adjacent to the alignment dimples on the mounting brackets on the wall sleeve ange two per side 6 Install the front cover assembly including the discharge grille by placing the...

Страница 16: ...mode the Even Temp Load Anticipation feature is enabled Quiet Fan Delay is also enabled in fan cycle mode to lessen the acoustical change between compressor start up and shut off by running the fan fo...

Страница 17: ...a heat pump to maintain the room temperature while running more ef ciently than resistance heat only models If the room temperature should fall more than 5 F from the set temperature the unit will run...

Страница 18: ...totheSmartCentercontroloftheunitreplace the jumper wire between the GL and GH terminals that was removed in step 1 ThermostatConnections C Common Ground W Call for Heating Y Call for Cooling R 24V Pow...

Страница 19: ...or tampering with the unit s internal wiring can void the equipmentwarrantyandmayresultinpropertydamage personal injury or death Other manufacturer s PTACs and even older Friedrich models may have di...

Страница 20: ...t Secure components and accessories such as the control door and front cover Check the unit air lter condenser coil and evaporator coil for any obstructions Check for proper operation of all component...

Страница 21: ...ct switch be installed on all hardwired units If installing a ush oor mounted unit make provisions for all the line voltage power leads and conduit to be removed for ease of maintenance and service to...

Страница 22: ...leeve NOTE Do not use a caustic coil cleaning agent on coils or base pan Use a biodegradable cleaning agent and degreaser NOTE Units are to be inspected and serviced by quali ed service personnel only...

Страница 23: ...engineer for proper sizing Istheoutdoortemperature60 Forbelow The unit is designed for outdoor temperatures above 60 F Istheindoortemperature80 Forabove Ambient indoor temperatures of 80 F or above wi...

Страница 24: ...ate ash set point and error code Automatically change over to Electric heat Mode only Leave unit running Defective sensor 06 If O D coil Temperature 175 Deg F for 2 consecutive minutes Heat Pump model...

Страница 25: ...e excess condensate Packaged in quantities of ten PXWE DEEP WALL SLEEVE EXTENSION A four inch deep anodized aluminiumextensionthatattachestotheoutsideofthewallsleeve when the wall is greater than elev...

Страница 26: ...LTER PACK These are original equipment return air lters They are reusable and can be cleanedbyvacuuming washing orblowingout andaresold in convenient ten packs Two lters per chassis PXCJ CONDUITKITWIT...

Страница 27: ...asonable proof must be presented to establish the original purchase date otherwise the beginning date of this certificate will be considered to be our shipment date plus sixty days Replacement parts c...

Страница 28: ...Air Conditioning Co Post Office Box 1540 San Antonio Texas 78295 1540 4200 N Pan Am Expressway San Antonio Texas 78218 5212 210 357 4400 FAX 210 357 4480 www friedrich com Printed in the U S A 920 08...

Отзывы: