background image

070.655-IOM (FEB 22)

Page 3

SBTP Rotary Screw Compressor

Installation - Operation - Maintenance

General information

Note:

 The information in this document is subject to 

change without notice.

This manual has been prepared to acquaint the owner and 
servicer with the Installation, operation, and maintenance 
procedures as recommended by Johnson Controls-Frick

®

 

for SBTP Rotary Screw Compressors.

It is most important that these compressors are correctly 
applied to an adequately controlled refrigerant or gas 
system. Consult your authorized Johnson Controls-Frick 
representative for expert guidance in this determination. 

Effective performance and continued satisfaction with 
these units depends on the following factors: 

•  Correct installation 
•  Correct operation 
•  Regular, systematic maintenance 

To ensure correct installation and application, select 
the appropriate equipment and connect to a correctly 
designed and installed system. The engineering plans, 
piping layouts, and other system design materials must be 
detailed in accordance with the best practices and local 
codes, such as those outlined in ASHRAE and API litera-
ture. 

A screw compressor is a vapor pump. To ensure that 

working fluid in the liquid state is not being ingested, per

-

form the following checks:

•   Select controls carefully. Make sure they are in good 

operating condition.

•   Size piping and arrange traps correctly, if they are 

necessary.

•   Check that the suction line has an accumulator or slug-

ging protection.

•   Know the load surges and make provisions for control.
•   Check that operating cycles and stand still periods are 

reasonable.

•   Size high-side components within system and com-

pressor design limits.

It is necessary to keep the discharge temperature high 
enough to prevent condensation of any moisture in the 
compressor and oil separator. 

Design limitations 

Frick compressors are designed for operation within the 

pressure and temperature limits which are specified by 

Johnson Controls-Frick and our CoolWare

 selection soft-

ware. They are primarily used for compressing refrigerant 
gas and most hydrocarbon gasses.

If your application is for sour gas, there are special re-
quirements to protect the compressor. Contact Johnson 
Controls-Frick Compressor Engineering for application 
details.

Job inspection 

Immediately upon delivery, examine all crates, boxes, and 
exposed compressor and component surfaces for damage. 
Unpack all items and check against shipping lists for any 
discrepancy. Examine all items for damage in transit. 

Standard bare compressor 

Items not included with bare compressor that are available 
as sales order options include a solenoid valve block, and 
solenoid valves.

Transit damage claims 

All claims must be made by consignee. This is an ICC 
requirement. Request immediate inspection by the agent 
of the carrier and be sure the correct claim forms are ex-
ecuted. Report damage or shortage claims immediately to 
Johnson Controls-Frick Sales Administration Department, 
Waynesboro, PA. 

Compressor identification 

Each compressor has an 

identification data plate, contain

-

ing compressor model and serial number mounted on the 
compressor body. 

NOTICE

When inquiring about the compressor or unit, or 
ordering repair parts, provide the model, serial, and 
Frick sales order numbers from the data plate. See 

Figure 1

.

Figure 1: Identification data plate

100 CUMBERLAND VALLEY AVENUE

WAYNESBORO, PA 17268

ROTARY SCREW COMPRESSOR

MODEL NO.

MAX DRIVER SPEED

MAX ALLOWABLE PRESSURE

PART NO.

RPM

PSIG

BARG

ASSEMBLED IN

FROM FOREIGN AND DOMESTIC MATERIALS

SERIAL NO.

Содержание SBTP 355 Series

Страница 1: ...ctions may result in personal injury or death damage to the unit or incorrect operation Rotary Screw Compressor SBTP 355 and 408 Series Form 070 655 IOM FEB 2022 Installation Operation Maintenance Fil...

Страница 2: ...enance General information 21 Normal maintenance operations 21 General maintenance 21 Changing the oil 21 Maintenance program 21 Maintenance schedule 22 Vibration analysis 22 Oil quality and analysis...

Страница 3: ...It is necessary to keep the discharge temperature high enough to prevent condensation of any moisture in the compressor and oil separator Design limitations Frick compressors are designed for operatio...

Страница 4: ...capacity sleeve bearings to carry radial loads at both the inlet and outlet ends of the compressor Heavy duty tilt pad thrust bearings mounted at the discharge end of the compressor to carry axial lo...

Страница 5: ...vely The cylindrical sleeve bearings are oil grooved for optimal lubrication and higher radial load capability The tilting pad thrust bearing uses offset pads and directed lubrication to minimize powe...

Страница 6: ...070 655 IOM FEB 22 Page 6 SBTP Rotary Screw Compressor Installation Operation Maintenance This page is intentionally left blank...

Страница 7: ...tion Do not exceed the rotor and bearing design set limitations of any compressor Refer to CoolWare for more information Outline dimensions See Figure 3 to Figure 12 for port locations Drawings are fo...

Страница 8: ...e 4 SBTP 355 compressor port locations view A A Suction 3511 compressor 10 300 ANSI flange 1 in 8 UNC 2B x 2 13 DP Proximity sensor phase probe 4X radial bearing RTD 4X proximity sensor vertical probe...

Страница 9: ...9 SBTP Rotary Screw Compressor Installation Figure 5 SBTP 355 compressor port locations view B B Figure 6 SBTP 355 compressor port locations view C C Axial bearing RTD Axial bearing RTD 2x Axial beari...

Страница 10: ...llation SC 15 SC 5 ST 1 SM 1 SC 9 SV 1 SC 6 ST 2 Figure 8 SBTP 408 compressor port locations SD 1 Discharge 10 in 300 ANSI flange 1 in 8 UNC 2B x 2 25 DP Standard piping arrangement View D D View E E...

Страница 11: ...X proximity sensor vertical probe 2X proximity sensor phase probe Suction compressors 4018 and 4021 16 in 400 ANSI flange 1 1 4 7 UNC 2B x 2 56 DP 20X on 22 500 B C Compressor 4013 12 in 400 ANSI flan...

Страница 12: ...ion SC 10 SC 11 Axial bearing RTD Axial bearing RTD Axial bearing RTD View C C Figure 11 SBTP 408 compressor port locations view C C Axial bearing RTD View E E View D D T SL 1 SC 3 SC 2 SL 2 P Dischar...

Страница 13: ...suction pressure SC 13 1 1 16 12 UN 2B straight thread o ring 980A0013K64 Inlet bearing drain suction pressure P 3 4 16 UNF 2B straight thread o ring 980A0013K60 Cylinder pressure manifold block pres...

Страница 14: ...g 980A0013K60 Drain suction pressure P 3 4 16 UNF 2B straight thread o ring 980A0013K60 Cylinder pressure manifold block pressure T 3 4 16 UNF 2B straight thread o ring 980A0013K60 Cylinder vent manif...

Страница 15: ...e or forklift by hooking into the two lifting rings at each end of the main housings Only use the compressor lifting rings to lift the compressor itself See the following figure Figure 13 Lifting ring...

Страница 16: ...ecific Frick oil for the refrigerant being used Depending on the application a different oil can be selected provided it is of the correct viscosity and is compatible with the refrigerant and compress...

Страница 17: ...gineering or a warranty claim may be denied Typical oil filter specification 5 75 according to ISO 4572 is required to obtain the recommended oil cleanliness class 16 14 11 according to ISO 4406 Oil c...

Страница 18: ...t and ensure design limitations are not exceeded Connect to and signal as shown in the Figure 17 For compressor panel instructions refer to the latest Quantum Controller Operations currently 090 070 O...

Страница 19: ...he compressor unloads when SV solenoid YY1 is energized and oil flows from the oil manifold through valve ports P and A to cylin der port SC1 and enters the unload side of the cylinder Si multaneously...

Страница 20: ...nd during initial start up 1 For effective and safe operation the compressor must be run at the correct speed and discharge pressure Exceeding design conditions creates a potential hazard 2 After 1 h...

Страница 21: ...without shutting down the package Avoid slugging the compressor with liquids oil while screw compressors are probably the most tolerant of any compressor type available today about ingestion of some...

Страница 22: ...ngs Oil quality and analysis High quality and suitable oil is necessary to ensure com pressor longevity and reliability Oil quality rapidly dete riorates in systems containing moisture and air or othe...

Страница 23: ...ems on the list are possible causes and which items are additional symptoms High discharge temperature and high oil temperature readings on a display may both be symp toms of a problem and not causall...

Страница 24: ...n until steady state conditions are met Shut down lock out motor starter and per form a hot alignment Long term storage For long term storage of 6 months to 5 years provisions are required regardless...

Страница 25: ...ged pressurize to be tween 5 psig to 15 psig with nitrogen See the following table for the amounts of oil needed for each compressor Table 8 Necessary oil volume Model Oil volume gal 3511 77 3515 94 3...

Страница 26: ...al problem is suspected contact Johnson Controls Frick Service Do not attempt to disassemble compressor Troubleshooting the oil pump and system Problem Cause Solution Pump does not produce enough oil...

Страница 27: ...he valve is functioning mechanically To actuate the solenoid mechanically insert a piece of 3 16 in rod against the armature pin and push the spool to the opposite end Push A side to confirm unload ca...

Страница 28: ...all high voltage wiring __ Confirm all 120 V control wiring is run in a separate conduit from compressor motor wiring __ Confirm no high voltage wiring enters the control panel at any point __ Check...

Страница 29: ...nter checked Marked N A Compressor coupling hub runout Motor coupling hub runout Initial cold alignment Initial hot alignment Final hot alignment Operating log sheet Date Time Hour meter reading Equip...

Страница 30: ...Manufacturer and size of coupling Motor manufacturer Motor serial number RPM Frame size H P Refrigerant Ambient room temperature F Operating conditions Date Sales order number End user Installing cont...

Страница 31: ...mil pk pk Compressor drive end male X and Y X ____ ____ mil pk pk Y ____ ____ mil pk pk Compressor non drive end female X and Y X ____ ____ mil pk pk Y ____ ____ mil pk pk Male axial displacement push...

Страница 32: ...p 5 slide valve 4 5 18 23 slide valve transmitter 18 solenoids 18 solenoid valves 19 start up 20 storage 15 suction accumulator 21 suction pressure 23 suction strainer 20 21 system piping 23 Index A a...

Страница 33: ...l pressure regulator 26 piston seals 26 pressure regulating valve 26 pump 26 pump strainer 26 service valves 26 slide stop 26 slide stop indicator rod 26 slide valve 26 solenoid coils 27 solenoid spoo...

Страница 34: ...nesboro PA 17268 1206 USA Phone 717 762 2121 FAX 717 762 8624 www johnsoncontrols com Frick Form 070 655 IOM 2022 02 Supersedes 070 655 IOM 2019 05 Subject to change without notice Published in USA 02...

Отзывы: