15
Probe extension
Cutout for passage of the
condensate drain tube.
Cutout for
passage of the
HGR% supply
tube (Only on
Vintage)
ou /or
6m RJ12 probe extension depending on the probe model
Drain and humidifier
OUT Mouting: Preparation of the ducted facade on the evaporator
Connect the RJ 12 socket (1) coming out
of the monobloc to the female//female
coupler (2).
Connect the supplied 6M RJ12 extension
(3) from the female//female coupler (2) to
the probe.
1
2
3
Genesis-Vintage
MPCG
DUCTED FACADE INSTALLATION
Installation of the grid by
clipping in the recess
provided for this purpose.