29
moisture residue and to dry up the surface. Chromed surfaces must be cleaned
with suitable cleaning agents. After cleaning, they must be dried up with a soft
cloth that does not leave dust.
•
Painted components must be cleaned with liquid cleaning agents without
abrasive materials. It is recommended to use special detergents purposed for
painted surfaces. The surfaces must be well dried up after washing. The paint
damage can cause metal corrosion at the scratch place.
•
Glass parts can be washed using the household window cleaning agents.
•
Some units have a wooden finish. Wood and surfaces of wooden products must
be cleaned dry. Also, wood polishers can be used. If necessary, surfaces can be
cleaned with a damp cloth and then dried thoroughly.
•
Protect electrical installations from moisture during cleaning.
•
It is necessary to regularly check drainage system.
•
Washing the serve-over with high-pressure washers is strictly forbidden.
Deep cleaning
Deep cleaning of the serve-over must be performed once every 4 weeks. The serve-
over must be cleaned and disinfected to eliminate pathogenic microorganisms.
•
Make sure that defrosting is in progress.
•
Remove the products from the serve-over, and temporarily place them in the
freezer compartment.
•
Disconnect electrical installations.
•
Remove the bottom shelves, air circulation grids, and evaporator covers.
•
Clean the ventilator of the serve-over from plaque. Remove foreign bodies from
the structures of the evaporator and ventilators.
•
Make sure that the drainage openings are not clogged, and condensate drains
freely.
•
Remove dust, possible residue of food products and the condensate residue from
surfaces.
•
Disinfect the internal space of the serve-over.
•
Clean and disinfect detached parts and dry them.
•
Assemble the detached components into the structure.
•
Switch on the power supply to the serve-over.
•
When the temperature in the internal space reaches the one that is specified in
the control, bring cooled products back into the cabinet.
12.
INNER LIGHTING
Available lighting options:
•
The unit with the fluorescent lamp.
•
The unit with LED column.
Содержание VEGA QB HG
Страница 1: ...OPERATION MANUAL SERVE OVER VEGA QB LG HG...
Страница 6: ...6 1 2 Dimensions Fig 2 Dimensions of Vega QB HG TD Fig 3 Dimensions of Vega QB LG TD...
Страница 7: ...7 Fig 4 Dimensions of Vega QB HG LU Fig 5 Dimensions of Vega QB LG LU...
Страница 14: ...14 Install the plastic legs Lower the serve over...
Страница 17: ...17 Apply silicone to seal the perimeter of connection Push the serve overs together...
Страница 18: ...18 With help of a level check if both serve overs are horizontal All 4 connection slot positions in the figure...
Страница 21: ...21 Example of installed serve overs...
Страница 35: ...35 Date Work Name...