![freightliner CL112 2015 Скачать руководство пользователя страница 162](http://html1.mh-extra.com/html/freightliner/cl112-2015/cl112-2015_maintenance-manual_2331367162.webp)
16. Using the yellow marks, center the bellows be-
tween the exhaust pipes. Verify that the pipe is
inserted at least 7/16 inch (10 mm) past the face
of the flange. See
, Ref. A.
17. Install the slip clamps on the bellows. Tighten the
slip clamps 11 lbf·ft (15 N·m).
18. Start the engine and check for exhaust leaks.
Tighten any clamps as needed.
02/23/2011
f490458
A
A
2
1
3
A. At least 7/16 inch (10 mm)
1.
Forward CGI Pipe
2.
CGI Bellows
3.
Aft CGI Pipe
Fig. 9, CGI Bellows Installation
02/08/2010
f490417
5
4
3
2
1
1.
CGI Bellows
2.
Slip Clamp
3.
Retaining Ring
4.
Graphite Gasket
5.
Forward CGI Pipe
Fig. 10, Forward Facing Slip Clamp Installation
Exhaust
49
Columbia Maintenance Manual, September 2015
49/6
Содержание CL112 2015
Страница 2: ......
Страница 4: ......
Страница 10: ......
Страница 32: ......
Страница 34: ......
Страница 38: ......
Страница 40: ......
Страница 42: ......
Страница 44: ......
Страница 46: ......
Страница 48: ......
Страница 50: ......
Страница 52: ......
Страница 60: ......
Страница 62: ......
Страница 66: ......
Страница 68: ......
Страница 74: ......
Страница 86: ......
Страница 94: ......
Страница 96: ......
Страница 104: ......
Страница 106: ......
Страница 116: ......
Страница 118: ......
Страница 120: ......
Страница 122: ......
Страница 128: ......
Страница 140: ......
Страница 142: ......
Страница 152: ......
Страница 156: ......
Страница 164: ......
Страница 166: ......
Страница 168: ......
Страница 172: ......
Страница 176: ......
Страница 178: ......
Страница 180: ......