lists all maintenance operations that are to
be performed at the initial maintenance (IM) interval.
Maintenance operation numbers are reference num-
bers used to help you find detailed instructions in this
manual on the maintenance operations to be per-
formed. All operations listed in
, along with
the operations listed in the M1 Maintenance Interval
Operations table (
) must be performed to
complete the initial maintenance (IM).
Initial Maintenance (IM) Operations
Number
Title
Perform All M1 Maintenance Interval Operations
Frame Fastener Torque Check
Suspension U-Bolt Torque Check
Alignment Check
Bendix Automatic Drain Valve Operating and Leakage Tests
*
Fuel Tank Band Nut Tightening
*
The automatic drain valve should be inspected every 6 months or 1500 operating hours, whichever comes first.
Table 2, Initial Maintenance (IM) Operations
General Information
00
00–02 Initial Maintenance (IM) Operations
108SD and 114SD Maintenance Manual, April 2021
00/3
Содержание 108SD 2021
Страница 3: ......
Страница 11: ......
Страница 27: ......
Страница 31: ......
Страница 33: ......
Страница 35: ......
Страница 37: ......
Страница 39: ......
Страница 41: ......
Страница 43: ......
Страница 45: ......
Страница 49: ......
Страница 51: ......
Страница 57: ......
Страница 59: ......
Страница 67: ......
Страница 77: ......
Страница 85: ......
Страница 87: ......
Страница 97: ......
Страница 107: ......
Страница 109: ......
Страница 111: ......
Страница 117: ......
Страница 119: ......
Страница 139: ......
Страница 141: ......
Страница 145: ......
Страница 147: ......
Страница 161: ......
Страница 163: ......
Страница 173: ......
Страница 177: ......
Страница 179: ......
Страница 181: ......
Страница 183: ......
Страница 185: ......
Страница 189: ......
Страница 191: ......