
Page 5
For technical questions, please call 1-888-866-5797.
Item 63051
Sa
FE
ty
Op
E
ra
ti
O
n
M
aint
E
nan
CE
a
SSEMBL
y
3. Lay the Wood Platform (3) over the Flange Pins that
extend up from the Side Rails and into the oblong
holes cut in the Wood Platform. These Flange Pins
must fit properly. Secure the Wood Platform in place
with the Platform Hold Downs (8). Refer to Figure C.
Guard rail
Holder
Side rail
Wood platform (3)
End Frame
platform Hold
Down (8)
Flange pin in
oblong hole
Figure C
WarninG!
The two Platform Hold Downs
must be in position as shown at all times
to keep the Wood Platform secure.
4. In addition to the Platform Hold Downs, use
the four Bolts (9), Nuts (10) and Washers (11)
to further secure the Wood Platform in place.
5. Guard rail holders are built into the Scaffold as noted
in Figure C. Guard rails (sold separately) must be
installed by a qualified technician. They must fit
properly into the Scaffold’s holders and must be
secured in place.
Wood platform
Washer (11)
nut (10)
Bolt(9)
platform
Hold Down
platform
Hold Down
Figure D