16
Pit+Plus
TM
Premium Simplex Package Systems
Step 4
Remove the six (6) bolts securing the switch module to the basin and remove. Feed pump cord through
the cord grommet opening until the switch module is free.
Step 5
Remove float switch by loosening the plastic wing nut opposite the cord grip. Loosen the wing nut until
the cord can be removed from the cord grip. Note: It is not necessary to remove the wing nut completely
to remove float cord.
Step 6
Install new float switch. The cord tether length (distance between the cord grip and the float housing)
should be 3.5 to 3.75 inches. Caution: Proper tether length is necessary to ensure proper liquid level
control and maximum life of product.
Step 7
Feed float switch cord(s) along with pump cord through the cord grommet opening.
Step 8
Install switch module to basin and secure with six (6) bolts.
Step 9
Insert cords in cord grommet and install cord grommet into the switch module. Caution: Remove any
cord slack that might potentially interfere with control float or optional alarm float operation.
Step 10
Connect switch and pump to power supply.
ECM (External Control Module) - Removal and Installation
Step 1
Disconnect pump and switch from power supply.
Step 2
Remove cord grommet from the switch access cover then separate the pump power cord from
the grommet.
Step 3
Remove the six (6) bolts securing the switch module to the basin and remove. Feed pump cord through
the cord grommet opening until the switch module is free.
Step 4
Feed pump cord through the cord grommet opening of the replacement ECM.
Step 5
Install ECM module and to basin and secure with six (6) bolts.
Step 6
Insert pump cords in cord grommet and install cord grommet into the switch module.
Caution: Remove any cord slack that might potentially interfere with optional alarm float operation.
Содержание Little Giant Pit+Plus 9JP2V2DA1
Страница 1: ...Pit Plus Installation Guide Patent Pending ...
Страница 19: ...19 NOTES ...