
EN
7
7
INSTALLATION
This hood is designed to be mounted on the ceiling/on a shelf, above a free-standing Hob (min. 650
mm), in:
•
Ducting version
: Evacuation to the outside.
•
Recirculation version
: Internal recirculation.
Warning: The F-Light hood is a system comprising hood + lamp, so that two separate electrical
wiring systems must be provided, one for the hood and one for the lamp.
Sequence of operations - Installation
• Preparing for installation
• Drilling the Ceiling/Shelf and Fixing the support plate
• Connections
• Fitting the hood body
• Functional
Check
• Disposal of Packaging
Fitting the Limiter pawl
• Unfasten the 3 screw that join the parts of the Plate (of different shapes and/or sizes) using
the wrench provided.
• Take the Pawl and fix it to the plate on the bracket in the position indicated in the figure,
using the screw provided.
• Take the bulb holders and slot them onto the
brackets provided, which can be seen by
their fork-shaped ends.
Warning
: the clamps used to fix the wires
must not be cut.
• Tighten the Screw fixing the bulb holders to
the bracket, in such a way as to hold the
latter between the 2 washers.
Содержание FUD 5007 I XS
Страница 5: ...EN 5 5 APOLLO JUPITER 20 Kg 2 12h 11 12c 4 3 5 12d 12g 14 1 12d 12d 12d 6 ...
Страница 6: ...EN 6 6 Dimensions APOLLO JUPITER ...
Страница 24: ...DE 2 24 APOLLO JUPITER 20 Kg 2 12h 11 12c 4 3 5 12d 12g 14 1 12d 12d 12d 6 ...
Страница 25: ...DE 2 25 Platzbedarf APOLLO JUPITER ...
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ...436005195_ver1 Franke S p a Via Pignolini 2 37019 Peschiera del Garda VR www franke it ...