8
03 / 2011
230 V
1 Ph/L/N/PE
0.6 kW
50 Hz
Last revised:
Technical modifications excepted!
en
CAUTION!
The pallet is built to allow the unit to roll off from the front ONLY, using two metal ramps.
Pushing toward the rear or sides may cause the unit to fall off pallet or tip over.
- Peel off the protective white plastic from all stainless steel surfaces.
Fry Bagging Station Fryers
F3D3P-Dispenser
or
F3D3P-Dispenser
Fryers Fry Bagging Station
3.3 POSITION THE UNIT
The F3D3P should be installed on a flat and level floor, which allows it to be rolled out for cleaning or rear service access. It
can be positioned on the right-hand or left-hand side of the fry station. The fry station line-up can be (from left-to-right):
Roll the unit into place and plug into a grounded 120-volt/60 Hz or 230-volt/50 Hz electric power outlet, per the unit data plate
requirements. A ten-foot (3 meter) power cord with voltage-specific plug is provided. Lock the two front caster brakes to secure
unit in position.
The equipment must be installed by qualified personnel, in accordance with the manufacturer’s
instructions.
The manufacturer accepts no liability whatsoever, if industrial safety standards are not observed.
Local, valid electrical installation and safety regulations must be observed.
Connection to the mains must be carried out in accordance with the relevant standards.
Before connecting to the mains, check that voltage and frequency given on the rating plate match the
values of the mains supply.
3.4 CONNECTION
NOTES
Voltage
Phases
Power
Frequency
Electronic potential equalisation
The unit must be integrated into a potential equalisation system. The corresponding clamp is marked
with a label. This connection must comply with regulations and be tested for effectiveness.