background image

Description of the appliance

Installation instructions

Operating instructions

Spare parts

Warranty certificate

Document n° 954-6 ~ 29/04/2004

STAUB FONDERIE

Head Office Address

2, rue Saint Gilles

68230 TURCKHEIM

RC Colmar

SIREN 439 330 325

Address - Administration and

manufacturing

BP 73

59660 MERVILLE (FRANCE)

Telephone : 00 333 28 43 43 43

Fax : 00 333 28 43 43 99

Subject to modifications.

Le Beffroi

Oil fired stove

Model 174 10 54

EN NO

Technical manual

to be saved

by the user

for future reference.

Содержание 174 10 54 Le Beffroi

Страница 1: ...NDERIE Head Office Address 2 rue Saint Gilles 68230 TURCKHEIM RC Colmar SIREN 439 330 325 Address Administration and manufacturing BP 73 59660 MERVILLE FRANCE Telephone 00 333 28 43 43 43 Fax 00 333 2...

Страница 2: ...Maintenance of the Chimney p 8 Operating instructions p 9 Fuel p 9 Lighting procedure p 9 Operating procedure p 9 Shutting down p 9 Maintenance of the stove p 9 Recommendation p 10 Trouble shooting p...

Страница 3: ...Beige 72553 Red 72605 Blue 72606 Marble panels Black 72805 Beige 72806 Gray 72807 1 3 Optional equipment Brass rampe KR 134 08 Mirrors P 174 10 53 Vent pipe 1 4 Specifications Model 174 10 54 Nominal...

Страница 4: ...stove float regulator fig 3 contains a filter G to trap impurities A safety lever B controls fuel flow Oil can only enter the float chamber when the safety lever is depressed Oil temperature variation...

Страница 5: ...15 ft high The flue must not be shared with any other appliance Downdraughts caused by obstacles close to the chimney top may sometimes be prevented by fitting an anti downdraught cap to the top of t...

Страница 6: ...rope in the groove on the rear and fit the flue spigot using the two bolts and washers supplied ensuring there is a good seal Replace the internal baffle fig 15 p 8 2 7 Smoke exit at rear Figure 7 Rem...

Страница 7: ...uickly increase the flame by turning the setting screw 4 clockwise if the flame is too high reduce the flame by turning the setting screw 4 counter clockwise High setting Refer to Fig 11 5 set the reg...

Страница 8: ...ng latch rotates around a pressure screw positioned cam Loosen pressure screw 1 Turn cam 2 to desired position Tighten pressure screw 1 2 13 Pre utilisation check Check the condition of the filler sea...

Страница 9: ...ting to adjust the control knob to a higher setting usually between a 2 and 4 setting When increasing the heat output move the control knob only 1 number allowing 5 minutes between moves for the flame...

Страница 10: ...t glass when the unit is running at a low burning rate When the main door is opened for cleaning the flame will be disturb and turn to a yellow flame Clean quickly but gently Close the door the flame...

Страница 11: ...Fire smokes Soot build up noticed Flame imbalance Insufficient air supply Increase fresh air supply open door window add make up air supply Downdraft or blockage in chimney Check Chimney for Soot buil...

Страница 12: ...15 149868 Knob 01 16 158624 Handle 01 17 162576 Descriptive plate 01 18 164205 Oil tight nut 02 19 165139 Float regulator 01 20 179615 Regulator shaft 01 21 181606 Ceramic rope 10 x 4 1 99 m 22 181607...

Страница 13: ...8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 4 6 4 7 4 8 4 9 5 0 5 1 5 2 5 3 5 4 5 5 5 6 5 7 5 8 5 9 6 0 6 1 6 2 6 3 6 4 6 5 6 6 6 7 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5...

Страница 14: ...2 Parts subject to wear or in contact with high temperatures namely soles and burner grills bottom plates baffles ash pans paintwork and surface treatments for decorative parts Also excluded from this...

Отзывы: