Framery 2Q Huddle
13 Install the door
13.1 Install the floor threshold
1.
Peel back 50 mm (2 in) of the side frame seal from both sides of the door frame.
2.
Set the floor threshold down at the doorway and slide agains the door frame.
Installation instructions
[email protected]
99
Содержание 2Q Lounge
Страница 1: ...Framery 2Q Huddle Installation instructions English Version 1 2 Tampere Finland 19 9 2022 ...
Страница 2: ......
Страница 6: ...Framery 2Q Huddle ...
Страница 184: ...Framery 2Q Huddle 184 Installation instructions info frameryacoustics com ...
Страница 185: ...Framery 2Q Huddle ...
Страница 186: ...Framery 2Q Huddle Installation instructions Patamäenkatu 7 33900 Tampere FINLAND VAT FI 23527139 ...