Framery 2Q Huddle
2.
Feed the long fan extension cord from the back of the pod through the groove in the
center beam and and into the pod from the light opening at the front.
Note:
Feed the extension cord to the same side of the ceiling beam as the
control unit.
3.
Connect the long fan extension cord to the FAN 2 connector of the control unit.
Installation instructions
[email protected]
155
Содержание 2Q Lounge
Страница 1: ...Framery 2Q Huddle Installation instructions English Version 1 2 Tampere Finland 19 9 2022 ...
Страница 2: ......
Страница 6: ...Framery 2Q Huddle ...
Страница 184: ...Framery 2Q Huddle 184 Installation instructions info frameryacoustics com ...
Страница 185: ...Framery 2Q Huddle ...
Страница 186: ...Framery 2Q Huddle Installation instructions Patamäenkatu 7 33900 Tampere FINLAND VAT FI 23527139 ...