53
Configuration - measurement
Illu. Example for current measurement using 3
current converters in a 3 phase 4 conductor net-
work.
A connection diagram does not have
to be configured for measurement in-
puts V4 and I4.
C
Connection diagram for current
measurement
You can select between the following connec-
tion diagrams for current measurement:
3p4w
- 3 phase 4 conductor, 3 current conv.
3p5w
- 3 phase 4 conductor, 4 current conv.
The fourth current transformer can be
used for measuring the neutral
conductor e.g.
3p2i
- 3 phase 4 conductor, 2 current conv.
For networks under symmetric load.
3p2i0
- 3 phase 3 conductor, 2 current conv.
Aron connection for networks without
a neutral conductor. The third current
will be calculated.
1p2i
- 1 Phasen 2 Leiter, 2 Stromwandler
Factory pre-setting: 3p4w
Содержание EM-PQ 2500
Страница 20: ...20 Installation Connection diagrams voltage measurement...
Страница 21: ...21 Installation Connection diagrams current measurement...
Страница 69: ...69 Configuration system...
Страница 81: ...81...
Страница 94: ...94 Dimensioned drawings Cutout size 138 0 8 x 138 0 8 mm Reverse side Patch cable Technical data...
Страница 95: ...95 View from below Side view Technical data...
Страница 100: ...100 Connection example EM PQ 2500 FRAKO 55 00077 05 11 All rights to technical changes are reserved...