FPI Hampton H15U-LP Скачать руководство пользователя страница 12

12

Hampton® H15U-NG/LP Direct Vent Freestanding Gas Stove

installation

1)

  Provide  adequate  clearances  for  servicing, 

proper operation and around the air openings 
into the combustion chamber. 

2)

  The appliance must be installed on a flat, solid, 

continuous surface (e.g. wood, metal, concrete). 
This may be the floor, or it can be raised up 
on a platform to enhance its visual impact. The 
appliance may be installed on carpeting, tile, 
wood  flooring  or  other  combustible  material, 
because the appliance's base extends the full 
width and depth of the appliance. The  Direct 
Vent Freestanding Gas Stove can be installed 
in a wide variety of ways and will fit nearly any 
room layout. It may be installed in a recessed 
position, framed out into the room, or across 
a corner.

3)

  The  Direct Vent Freestanding Gas Stove  is 

approved for alcove installations, which meet 
the  clearances  listed  in  the  "Clearance  to 
Combustibles" section.  This unit is approved 
for manufactured home installations, see the 
"Manufactured  Mobile  Home  Additional  Re-
quirements" and "Rigid Pipe Venting Systems" 
sections for the required vent arrangements. 
If installed into a manufactured home the unit 
must be bolted down to the floor. 

4)

  This appliance is Listed for bedroom  instal-

lations when used with a Listed Millivolt Ther-
mostat. Some areas may have further require-
ments, check local codes before installation.

5)

  This appliance is Listed for Alcove installations, 

maintain minimum Alcove clearances as fol-
lows,  minimum width of  32-1/2" (825mm), a 
maximum depth of 36" (914mm), and minimum 
height of 24" (610mm) from top of unit to ceiling.

6)

  We recommend that you plan your installation on 

paper using exact measurements for clearances 
and floor protection before actually installing this 
appliance.  Have a qualified building inspector 
review your plans before installation.

General Safety Information

1)

  The appliance installation must conform with 

local Canadian Electrical Code.

2)

  The appliance when installed, must be electri-

cally grounded in accordance with local codes, 
or in the absence of local codes with the current 
National Electrical Code, ANSI/NFPA 70 or CSA 
C22.1 Canadian Electrical Code.

3)

  The  appliance should be inspected for shipping 

damage before use and 

serviced annually by 

a professional service person

. More frequent 

cleaning  may  be  required  due  to  excessive 
lint  from  carpeting,  bedding  material,  etc.  It 
is imperative that control compartments, and 
circulating air passageways of the appliance 
be kept clean and free from excessive lint from 
carpeting.

4)

  See  general  construction  and  assembly  in-

structions. The appliance and vent should be 

enclosed when installed in or passing through a 
living area, where children may come in contact 
with it.  

5)

  This appliance must be connected to the speci-

fied vent and termination cap to the outside of 
the building envelope. 

Never  vent  to  an-

other room or inside a building.  Make sure that 
the vent is fitted as per the instructions starting 
in the "Exterior Vent Terminal Locations" section.

6)

  Inspect the venting system annually for block-

age and any signs of deterioration.   

7)

  Venting terminals shall not be recessed into a 

wall or siding.

8)

  Any safety glass removed for servicing must 

be replaced prior to operating the appliance.  

9)

  To prevent injury, do not allow anyone who is  

unfamiliar with the operation to use the fireplace.

  

Installation Checklist

1) 

Locate your gas appliance. Refer to the following 
sections: 

 

a. Locating Your Gas Stove

 

b. Clearances to Combustibles

 

c.  "Venting  Introduction"  to  "Exterior  Vent   
    Terminal Locations" sections.

2) 

Install Optional Fan. Refer to the "Optional Fan 
Installation" section.

3)  

Set vent restrictor. Refer to the "Vent Restrictor 
Position" section.

4) 

Install venting: Check all venting requirements. 
See "Venting Introduction" to  "Dura-Vent Verti-
cal Termination" sections. 

5)

  Make gas connections. Refer to the "Gas Con-

nection" section.

 

Test the pilot. Must be as per diagram in the 
"Pilot Adjustment" section.

 

If converting to Propane, make changes prior 
as instructed in the "Conversion from Natural 
Gas to Propane" section.

6)

  Test  Gas  Pressure.  Refer  to  the  "Gas  Pipe 

Pressure Testing" section.

7)

  Install standard and optional features.  Refer 

to the following sections where applicable: 

 

a. Log Set Installation

 

b. Wall Thermostat

 

c. Remote Control

 

d. LP Conversion Kit

 

e. Fan Kit

8)

  Final check. Refer to the "Final Check" section.

Before  leaving  this  unit  with  the  customer,  the 
installer must ensure that the appliance is firing cor-
rectly and 

operation fully explained to customer

.

This includes:

1)

  Clocking the appliance to ensure the correct 

firing  rate  (rate  noted  on  label)  after  burning 
appliance for 15 minutes.

2)

  If required, adjusting the primary air to ensure 

that the flame does not carbon. First allow the 
unit to burn for 15-20 min. to stabilize.

CAUTION: Any alteration to the product that 
causes sooting or carboning that results in dam-
age is not the responsibility of the manufacturer.

Emissions  from  burning    wood  or  gas  could 
contain  chemicals  known  to  the  State  of  Cali-
fornia  to    cause  cancer,  birth  defects  or  other 
reproductive harm.

Содержание Hampton H15U-LP

Страница 1: ...hat to do if you smell gas Do not try to light any appliance Do not touch any electrical switch Do not use any phone in your building Immediately call your gas supplier from a neighbour s phone Follow...

Страница 2: ...rking with letters on a contrasting background located adjacent to the controlling device or in an equally conspicuous position where the instruction can be easily read April 22 14 Created draft Doubl...

Страница 3: ...the Lighting Plate Instructions 10 Important Message 11 Specifications 11 Mobile Manufactured Homes After First Sale 11 Before You Start 11 General Safety Information 12 Installation Checklist 12 Cle...

Страница 4: ...Horizontal Vent 19 3 8 492mm 23 1 8 587mm 20 11 16 525mm 17 1 2 444mm 14 1 4 361mm 13 5 8 345mm 24 1 8 612mm 20 13 16 529mm 18 15 16 481mm ALL PICTURES DIAGRAMS SHOWN THROUGHOUT THIS MANUAL ARE FOR IL...

Страница 5: ...irect Vent Freestanding Gas Stove 5 safety label Unit Dimensions with Vertical Vent 19 3 8 492mm 23 1 8 587mm 24 13 16 630mm 20 11 16 525mm 18 3 8 467mm 17 1 2 444mm 15 1 16 383mm 14 1 4 361mm 13 5 8...

Страница 6: ...nstruction and Safety Standard Title 24 CFR Part 3280 in the United States or when such a standard is not applicable ANSI NCSBCS A225 1 NFPA 501A Manufactured Home Installations Standard or ANSI A119...

Страница 7: ...e directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VEN...

Страница 8: ...converted to top or rear vent per manual instructions and the insulation discarded Venting YES NO Are the venting components approved for the unit installed Does the venting configuration comply with...

Страница 9: ...as the air shutter on the proper setting after running the unit for 20 minutes If applicable were the surround and trims installed according to the manual Was the operation of the fan lights if instal...

Страница 10: ...e allum e manuellement Respectez les instructions ci dessous la lettre B AVANT LA MISE EN MARCHE reniflez tout autour de l appareil pour d celer une odeur de gaz Reniflez au niveau du plancher car cer...

Страница 11: ...SA C22 1 in Canada Before You Start Safe installation and operation of this appliance requires common sense however we are required bytheCanadianSafetyStandardsandANSIStand ards to make you aware of t...

Страница 12: ...air passageways of the appliance be kept clean and free from excessive lint from carpeting 4 See general construction and assembly in structions The appliance and vent should be enclosedwheninstalledi...

Страница 13: ...o Combustibles The clearances listed are MINIMUM distances Measure the clearance to both the appliance and the chimney connector The farthest distance is correct if the two clearances do not coincide...

Страница 14: ...training it 4 Remove the Top Control Panel Assembly by removing the three screws 7 Connect the red and black wires from the wire harness to speed controller NOTE Speed control wires should be at the b...

Страница 15: ...red to 501 red Secure all the wires using wire holder on the rear panel 16 Slide the Rear Access Panel back into position and secure with 2 screws WARNING Electrical Grounding Instructions This appli...

Страница 16: ...mbustion to the outside while the outer pipe draws outside combustion air into the combustion chambertherebyeliminatingtheneedtouseheated room air for combustion and losing warm room air up the chimne...

Страница 17: ...of center line extended above meter regulator assembly 36 90cm a J Clearance to service regulator vent outlet 36 90cm K Clearance to non mechanical air supply inlet to building or the combustion air i...

Страница 18: ...e Length 7 Galvanized N A N A 4D7A N A N A N A N A Adjustable Length 7 Black N A N A 4D7AB N A N A N A N A Extension Pipe 8 1 2 Galvanized 46DVA 08A N A N A N A N A N A N A Extension Pipe 8 1 2 Black...

Страница 19: ...oCap 946 205 Vinyl Siding Shield for Riser Vent Terminal 510 994 Rigid Pipe Adaptor Must use with all rigid piping 946 208 P Vent Guard Optional for Riser Vent Terminal 640 530 P Riser Vent Terminal 9...

Страница 20: ...t Vent SelkirkDirect Temp AmeriVent Direct venting and Security Secure Vent systems Use of these systems with the Rigid Pipe adaptor is deemed acceptable and does not affect the Intertek WHI listing o...

Страница 21: ...eet with min of 8 feet total vertical and max 8 feet total horizontal Please note min 1 foot between 90o elbows is required With these options maxi mum total pipe length is 30 feet with minimum of 6 f...

Страница 22: ...ote min 1 foot be tween90o elbowsisrequired Option H H1 V A 2 Max 2 Min B 3 Max 3 Min C 4 Max 4 Min D 5 Max 5 Min E 6 Max 6 Min With these options max total pipelengthis30feetwithmin of6feettotalverti...

Страница 23: ...runs with vertical terminations Maximum two 45o elbows If the vent is ENCLOSED in a chase min size 9 x 9 maintain a 1 1 4 clearance to combustibles May be installed in Manufactured Mobile Homes after...

Страница 24: ...the vent is unrestricted Masonry chimneys may take various contours which the flexible liner will accommodate However keep the flexible liner as straight as possible avoid unnecessary bending The Air...

Страница 25: ...5o elbow will seat onto both the starter collar and the 90o elbow Crimped section of rigid pipe seats into the 90o elbow Only cut the uncrimped side of pipe Dismantle all pipe sections including vent...

Страница 26: ...collar 8 Cut the 4 dia flex liner to the desired size Hint leave an extra 12 to 16 of length this willmakethefinalassemblyeasiertoworkwith 9 Secure the 4 dia flex liner to the 4 adapter with Mill Pac...

Страница 27: ...minum Vent 1 946 202 Wall Penetration Heat Shield Wall Thimble 2 pcs 1 640 530 P Riser Vent Terminal 1 640 545 P Decorative Wall Trim Black 1 948 128 Tube Mill Pac Screws 380 946 Horizontal Terminatio...

Страница 28: ...insulation Theminimumclearancerequirementsbetween the outer wall of the vent pipe and nearby com bustible surfaces is 1 1 4 inch Be sure to check the vent termination clearance requirements from decks...

Страница 29: ...ns section c Snorkel Terminations For installations requiring a vertical rise on the exterior of the building 14 inch and 36 inch tall Snorkel Terminations as shown in Diagram 2 are available as well...

Страница 30: ...c Before connecting the vent pipe to the vent termination slide the black decorative wall thimble cover over the vent pipe then slide the Wall Penetration Heat Shield Part 946 202 over the vent pipe...

Страница 31: ...ting sys tem it is highly recommended to apply Mill Pac sealant supplied to every inner pipe connection Failure to do so may result in drafting or performance issues not covered under warranty Silicon...

Страница 32: ...sleeve on the top side of the Connector Use 3 sheet metal screws to assemble these two parts 6 Push the flex pipe back up into the ceiling sup portbox centertheRetroConnector andattach it to the supp...

Страница 33: ...chimney in a convenient location as near as possible to the appliance outlet Cut and frame a hole in the roof for the support The sides of this hole must be vertical with 1 1 4 clearance 2 Place the...

Страница 34: ...finished reading manometer turn off the gas valve disconnect the hose and tighten the screw clockwise with a 1 8 flat screwdriver Note Screw should be snug but do not over tighten Aeration Adjustment...

Страница 35: ...and lift out Installation of LPG Conversion Kit 4 Turn control knob to the OFF position 5 Remove the Hi Low extension knob by pulling it towards you This will expose the black protection cap Remove t...

Страница 36: ...on of the DC Sparker 19 Remove the control panel by unscrewing the 2 screws 21 Plug up the Piezo hole with the plastic bushing 22 Attach the DC sparker generator connector to the valve with a screw 23...

Страница 37: ...Center Front Log e Embers f Platinum Embers 946 669 supplied with packaged manual Left Front Log Right Front Log 4 Remove Glass front see instructions in manual 3 Remove Cast Front and set the light a...

Страница 38: ...of burner to the other If there is any flame hesitation check that area for any blockage of the burner ports 11 Re install the Glass Front Cast Front and Top 8 Take the embers and place on the burner...

Страница 39: ...LC or UL approved may be used Thermostat Wire Table Final Check Before leaving this unit with the customer the installer must ensure that the appliance is firing correctly This includes 1 Clocking the...

Страница 40: ...away from sharp edges WARNING Electrical Grounding Instructions This appliance is equipped with a three pronged grounding plug for your protection against shock hazard and should be plugged directly...

Страница 41: ...remaining from manufactur ing Smoke detectors in the house may go off at this time Open a few windows to ventilate the room for a couple of hours The glass may require cleaning DONOTATTEMPTTOCLEANTHEG...

Страница 42: ...allum e manuellement Respectez les instructions ci dessous la lettre B AVANT LA MISE EN MARCHE reniflez tout autour de l appareil pour d celer une odeur de gaz Reniflez au niveau du plancher car cert...

Страница 43: ...e this is normal operation of a gas regulator or valve Unit Body Firebox Different types and thicknesses of steel will expand and contract at different rates resulting in some cracking and ticking sou...

Страница 44: ...can cause corrosion of caps pipe and fittings It may be caused by havingexcessivelateralruns toomanyelbows and exterior portions of the system being ex posed to cold weather 4 Inspect joints to verify...

Страница 45: ...he burner tray assembly simply reverse these instructions Toremovevalvefromvalveassembly continue 13 Remove two 2 thermopile wires 14 Remove thermocouple with a 9 mm metric wrench 15 Remove pilot nut...

Страница 46: ...the list should be checked by a licensed gas service technician during the annual service check Your unit may require more frequent maintenance checks if you notice any changes in how it operates Ope...

Страница 47: ...lTimberlineBrown 4 383 237 Top Front Grill Cream 5 384 007 Rear Panel 6 280 033 Control Panel Top Rear 7 920 443 Control Panel Decal Top On Off Fan 8 384 917 Fan Assembly Complete 9 945F SimpsonDurave...

Страница 48: ...ng Elbow 90 Degree Forged Valve Outlet End N S 904 606 Fitting Elbow 90 Degree Forged Valve Inlet End N S 904 658 Inlet Flex Line Gas SS Steel 24 inch N S 910 941 4 m m Valve Screw With Red O Ring N S...

Страница 49: ...Hampton H15U NG LP Direct Vent Freestanding Gas Stove 49 notes...

Страница 50: ...n Control Boards Wiring Switches Blowers Blower Control Module Battery Pack Remote Control Systems 2 Enamel Panels 1 Venting Venting Components 1 All Stainless steel surrounds 1 All Firebox Media Crys...

Страница 51: ...wndrafts installation error installation by an unqualified installer incorrect chimney components including but not limited to cap size or type operator error abuse misuse use of improper fuels lack o...

Страница 52: ...ide the U S should consult their local provincial or national legal codes for additional terms which may be applicable to this warranty How to Obtain Warranty Service Customers should contact the auth...

Страница 53: ...elow in order for us to serve you better Warranty Registration Form or Register online immediately at the above Web Site Warranty Details Serial Number required Purchase Date required mm dd yyyy Produ...

Страница 54: ...54 Hampton H15U NG LP Direct Vent Freestanding Gas Stove warranty...

Страница 55: ...Hampton H15U NG LP Direct Vent Freestanding Gas Stove 55...

Страница 56: ...Dealer Name Address _______________________________________________ ___________________________________________________________________ Installer ______________________________________________________...

Отзывы: