![FP optimail 30 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/fp/optimail-30/optimail-30_installation-manual_2325900010.webp)
optimail 30 Installation Guide
10
Step 5:
Mounting the scale platform
The scale comes mounted to the optimail 30
on delivery. You need only attach the scale
platform.
• Hold the scale platform such that the long
slot in the scale platform foot points to the
right (towards the display).
• Place the scale platform onto the scale
receptacle from above. The long slot of the
scale platform must slide in the counterpart
on the scale receptacle.
• Press down slightly on the scale platform
with your flat hand.
Slot, long
Содержание optimail 30
Страница 1: ...optimail 30 Postage meter Installation Guide ...
Страница 27: ...For your notes 27 ...
Страница 28: ...For your notes 28 ...
Страница 29: ...For your notes 29 ...
Страница 30: ...For your notes 30 ...
Страница 32: ...51 0034 3068 00 Rev 03 2010 05 xxx helbig berlin ...