
Now that the sensor is isolated in the chamber of the Packing Gland
Assembly, the FT3 meter is ready to either perform the Zero CAL-CHECK™
test or set the Field baseline for future tests.
When the meter has completed the test, be sure to open the shut-off valve,
slide the meter downward until the ferrule rests in the fittings, and tighten the
small nut of the fittings in order to seal the probe in the stream again.
Check to be sure the meter has returned to normal operation.
Starting the Field Baseline Set
After the meter has been installed and wired correctly (see the Fox FT3
Instruction Manual that came with the meter), power on the meter.
The meter should default to display #1. Press "
F1
" to program the meter.
Press
Yes (F1)
to set Parameters and you will be prompted to enter the
password. Use a Level 2 password (9111). The display will show:
F1 F2 F3 F4
Press
FLO (F2)
to go to the Flow Parameter 1 Menu.
F1 F2 F3 F4
Press
DGN (F1)
to go to the Diagnostic Test Menu.
F1 F2 F3 F4
Press
TST (F2)
to get to the Diagnostic Test Sub-Menu.
FLOW PARAMETER 1
DGN UNT PRM EXIT
SET PARAMETERS
I/O FLO DSP EXIT
DIAGNOSTIC
SIM TEST EXIT
13
Start Up
Calibration Validation
ST
ART UP
399 Reservation Road, Marina, CA 93933 Ph: 831.384.4300 Fax: 831.384.4312
Packing Gland
Assembly
Setting Field
Baseline