![Fortress Building Products Fe26 AXIS Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/fortress-building-products/fe26-axis/fe26-axis_installation-instructions-manual_2322373014.webp)
14
Fe
26
AXIS INSTALLATION
Step 6:
Install Uprights
1. Insert uprights into the cut panel. As shown in Fig. 1.
2. Starting on one end, use a rubber mallet to fully seat
upright on to rails and pickets. As shown in Fig. 2.
Fig. 2
Fig. 1
Step 7:
Cut Opposite Side Of Panel
1. Repeat steps 1 - 6 for the opposite side of panel.
Step 8:
Test Fit Panel
1. Once both uprights are inserted, test fit the panel to
confirm length. As shown in Fig. 1.
2. Confirm inside face of post to inside face upright spacing.
CANNOT exceed 4” [ 102mm].
Fig. 1
Step 9:
Install Set Screws
1. Once panel length is confirmed, measure 1/2” from inside
edge of upright and mark screw hole. As shown in Fig. 1.
2. Pre-drill screw holes with a 3/16” [5mm] drill bit.
3. Attach screw to the panel and upright with supplied T-25
Pan Head Self Taping Screws. Use low speed setting on
drill. As shown in Fig. 2.