Fortinet FPM-7620F Скачать руководство пользователя страница 13

Hardware installation

Fortinet Technologies Inc.

FPM-7620F mounting hardware

Closed

Secure Screw

Module Lever

Power Slider

Power Slider

Alignment Pin

Module Lever

Secure Screw

Alignment Pin

Open

(to open move the power slider up about 2 mm)

The FPM-7620F module levers align the module in the chassis slot and insert and eject the module from the slot. The 
power sliders activate micro switches that turn on or turn off power to the module. When both sliders are raised, the 
module cannot receive power. When the sliders are fully closed,  the module can receive power if it is fully inserted into a 
chassis slot.

Inserting a FPM-7620F module into a chassis

This procedure describes how to insert a FPM-7620F module into slot 3 or up of a FortiGate-7000 chassis. The 
procedure includes photographs to illustrate the procedure steps. The photos were taken in one of Fortinet's hardware 
labs using a generic module and FortiGate-7000 chassis.

FPM-7620F Processing Module Guide

13

Содержание FPM-7620F

Страница 1: ...FPM 7620F Processing Module Guide FortiGate 7000F Series...

Страница 2: ...rt fortinet com FORTINET TRAINING CERTIFICATION PROGRAM https www fortinet com support and training training html NSE INSTITUTE https training fortinet com FORTIGUARD CENTER https fortiguard com END U...

Страница 3: ...g hardware 12 Inserting a FPM 7620F module into a chassis 13 Shutting down and removing a FPM 7620F board from a chassis 19 Troubleshooting 24 FPM 7620F does not startup 24 FPM 7620F status LED is fla...

Страница 4: ...ange log Date Change description April 8 2021 Removed information about the console port which is not supported Added the average power consumption March 30 2021 Minor fixes March 16 2021 Initial rele...

Страница 5: ...on accelerates network traffic processing with two NP7 processors and accelerates content processing with eight CP9 processors The NP7 network processors are connected by the FIM switch fabric so all...

Страница 6: ...o make sure they are in their bottom position If the module LEDs do not light the module is not receiving power If this happens check the power sliders to make sure they are in their bottom position S...

Страница 7: ...ysical Description Dimensions 1 69 x 17 11 x 18 56 in 43 x 435 x 471 mm Height x Width x Length Weight 16 19 lb 7 35 kg Operating Temperature 32 to 104 F 0 to 40 C Storage Temperature 13 to 158 F 25 t...

Страница 8: ...ace Off No Link MGMT Speed Green Connection at 1Gbps Amber Connection at 100Mbps Off Connection at 10Mbps Turning the module on and off You can use the front panel power button to turn the module powe...

Страница 9: ...received from FIM data interfaces and from FPM data interfaces FPM 7620F hardware architecture Chassis Base Backplane Chassis Fabric Backplane Integrated Switch Fabric 2 x 50G 2 x 400G 2 x NP7 NP 0 1...

Страница 10: ...ey generation l Handshake accelerator with automatic key material generation l True Random Number generator l Elliptic Curve support for NSA Suite B l Sub public key engine PKCE to support up to 4096...

Страница 11: ...t in removing these transceivers To install transceivers To complete this procedure you need l A FPM 7620F l Transceivers to install l An electrostatic discharge ESD preventive wrist strap with connec...

Страница 12: ...chassis front panel and connected to the chassis backplane To position the module correctly you must use the mounting hardware shown below for the right of the FPM 7620F front panel The mounting hard...

Страница 13: ...switches that turn on or turn off power to the module When both sliders are raised the module cannot receive power When the sliders are fully closed the module can receive power if it is fully inserte...

Страница 14: ...or removing the FPM 7620F from a chassis slot handle the module by the front panel The levers are not designed for carrying the module If the levers become bent or damaged the FPM 7620F may not align...

Страница 15: ...3 Unlock the left and right module levers by pushing the power sliders up until the levers pop open Before sliding the final portion of the module into the chassis fully open both levers by pushing t...

Страница 16: ...front faceplate not the levers to slide the module into the slot The module should glide smoothly If you encounter any resistance the module could be aligned incorrectly Pull the module back out and t...

Страница 17: ...connects the module rear connectors to the chassis backplane The design of the levers leaves gaps to compensate for tolerances So even when the levers are fully closed the module may not be fully into...

Страница 18: ...ully tighten the two secure screws Do not use a power screwdriver because the high torque and speed can damage the chassis or screw thread After tightening both secure screws the module is fully seate...

Страница 19: ...powered on check the modle LEDs to verify that the module is operating correctly LED Normal operation state Status Green Alarm Off HA Off Power Green Shutting down and removing a FPM 7620F board from...

Страница 20: ...from static discharge and physical shock Only handle or work with FPM 7620Fs at a static free workstation Always wear a grounded electrostatic discharge ESD preventive wrist strap when handling FPM 7...

Страница 21: ...Fully loosen the secure screws otherwise the levers may be damaged when used to eject the module from the chassis slot Do not use a power screwdriver because the high torque and speed can damage the c...

Страница 22: ...ht levers by pushing the power sliders up until the levers pop open Push the power sliders up to fully open both levers If the chassis is powered on this step turns off the module s power Levers pop o...

Страница 23: ...allation Fortinet Technologies Inc 5 Use moderate force to fully open the levers and eject the module from the chassis Levers opened Rotate to open Module ejects Module ejected FPM 7620F Processing Mo...

Страница 24: ...F may not start up Make sure the sliders are fully closed and the levers are correctly aligned fully inserted and locked and the secure screws are tightened Firmware problem If the FPM 7620F is receiv...

Страница 25: ...the module is operating a fault condition may exist At the same time the FPM 7620F may stop processing traffic To resolve the problem you can try removing and reinserting the FPM 7620F in the chassis...

Страница 26: ...ndition is not achieved due to uneven mechanical loading Chargement M canique Montage de l quipement dans le rack doit tre telle qu une situation dangereuse n est pas li un chargement m canique in gal...

Страница 27: ...g it can result in an explosion Leaving a battery in an extremely hot environment can result in leakage of flammable liquid gas or an explosion If a battery is subjected to extremely low air pressure...

Страница 28: ...in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense WARNING Any changes or modifications to this produc...

Страница 29: ...afety Electrical Appliance Material PSE Japan PSE Bureau of Standards Metrology and Inspection BSMI Taiwan The presence conditions of the restricted substance BSMI RoHS table are available at the link...

Страница 30: ...inet enters a binding written contract signed by Fortinet s General Counsel with a purchaser that expressly warrants that the identified product will perform according to certain expressly identified...

Отзывы: