background image

FortiController-5913C Session-Aware Load Balancing Cluster (SLBC) System Guide

10-500-259409-20160210

http://docs.fortinet.com/

Cautions and Warnings

Environmental specifications

Operating Temperature 

– If this device is installed in a closed or multi-unit rack assembly, the rack’s ambient temperature 

may be greater than the room’s ambient temperature. Make sure the rack environment is compatible with the manufacturer’s 
maximum rated ambient temperature (Tma). 

Température ambiante élevée

 — Si cet appareil est installé dans un cabinet fermé, la température ambiante du cabinet peut 

être supérieure à la température ambiante de la pièce. Assurez- vous que l’environnement dans le cabinet est compatible avec 
la température ambiante maximale du fabricant (Tma).

Air flow

 – For rack installation, make sure that the amount of air flow required for safe operation of the equipment is not 

compromised. For free-standing installation, make sure that the appliance has at least 2 inches (5 cm) of clearance on each 
side to allow for adequate air flow and cooling.

Ventilation

 — Pour une installation dans un cabinet, assurez-vous que la ventilation nécessaire au fonctionnement de 

l’équipement n’est pas compromise.  Pour une installation autonome, assurez-vous que l’appareil dispose d’au moins 2 
pouces (5 cm) de dégagement de chaque côté pour permettre l’écoulement de l’air et un refroidissement adéquat.

Circuit overloading

 – To avoid overloading, use the ratings on the label. Consider the equipment’s connection to the supply 

circuit and the effect that circuit overloading might have on current protection and supply wiring. 
For redundant power sources, connect each to an IEC/UL Listed power source whose output rating is greater than or equal to 
the equipment.

Surtension

 – Pour éviter de surcharger le circuit d’alimentation, référez-vous aux notes sur l’étiquette de l’équipement . 

Envisagez l’effet que la surtension du circuit pourrait avoir sur la protection de surtension et le câblage d’alimentation .
Pour les sources d'alimentation redondantes, connectez chacun à une source d'alimentation Mis CEI / UL dont la cote de 
rendement est supérieur ou égal à l'équipement.

Reliable earthing

 – Make sure all rack-mounted equipment is grounded. This includes supply connections (e .g . power 

strips), not only direct connections to the branch circuit.

Mise à la terre

 – Assurez-vous que tout l’équipement est mis à la terre . Ceci comprend les connexions d’alimentation (par 

exemple, les barres d’alimentation) en plus des connexions directes au circuit de dérivation.

Interference

 – If possible, use Shielded Twisted Pair (STP) Ethernet cables instead of Unshielded Twisted Pair (UTP) .

Interférence

 – Si possible, utilisez des câbles Ethernet de paire torsadée blindée (STP) plutôt que de paire torsadée non 

blindée (UTP).

Mechanical loading

 – To avoid personal injury or damage to the appliance, Fortinet recommends that 2 or more people 

together install the appliance into the rack.  Balance the equipment to avoid uneven mechanical loading and tipping.  Do not 
place heavy objects on the appliance. 

Installation

 – Pour éviter des blessures ou des dommages à l’appareil, Fortinet recommande que deux personnes ou plus 

installent ensemble cet équipement dans un cabinet. L’installation du matériel à l’intérieur de la baie doit être effectuée de 
façon à éviter toute situation dangereuse liée à une installation non conforme .  Ne placez pas d’objets lourds sur l’appareil, 
celui-ci n’étant pas conçu pour soutenir un poids additionnel. 

Refer to specific Product Model Data Sheet for Environmental Specifications (Operating Temperature, Storage Temperature, 
Humidity, and Altitude)

Safety 

Moving parts

 — Hazardous moving parts. Keep away from moving fan blades.

Pièces mobiles

 – Pièces mobiles dangerouses. Se tenir éloigné des pales de ventilateurs mobiles.

Do not install this equipment in a home or public area accessible to the general population. When installed in schools, this 
equipment must be installed in a location where access is restricted to trained personnel.
Dans les écoles, ce matériel doit être installé en lieu sûr, de façon à le rendre accessible seulement aux personnels qualifies.

Battery

  – Risk of explosion if the battery is replaced by an incorrect type. Do not dispose of batteries in a fire. They may 

explode. Dispose of used batteries according to your local regulations. IMPORTANT: Switzerland: Annex 4.10 of SR814.013 
applies to batteries.

Batterie

  – Risque d’explosion si vous remplacez la batterie par un modèle incompatible. Jetez les piles usagées selon les 

réglementations locales en vigueur. IMPORTANT: Suisse: Annexe 4.10 de SR814.013 s’appliquant aux batteries.

警告
本電池如果更換不正確會有爆炸的危險
請依製造商說明書處理⽤過之電池

Содержание FortiController-5913C

Страница 1: ...ortiGate 5000 series documents are available from the FortiGate 5000 page of the Fortinet Technical Documentation web site http docs fortinet com Access to Fortinet customer services such as firmware...

Страница 2: ...t is grounded This includes supply connections e g power strips not only direct connections to the branch circuit Mise la terre Assurez vous que tout l quipement est mis la terre Ceci comprend les con...

Страница 3: ...own and Removing a FortiController 5913C board 17 Resetting a FortiController 5913C board 19 Troubleshooting 20 FortiController 5913C does not startup 20 FortiController 5913C status LED is flashing d...

Страница 4: ...n 28 Customer service and support 28 Fortinet products End User License Agreement 28 Regulatory Notices 30 Federal Communication Commission FCC USA 30 Industry Canada Equipment Standard for Digital Eq...

Страница 5: ...FortiGate 5001D workers can handle up to 40 Gbps of traffic FortiGate 5001B and FortiGate 5101C workers can handle up to 10 Gbps The FortiController 5913C can also provide 40 gigabit fabric and 1 gig...

Страница 6: ...istribute sessions to workers installed in chassis slots 3 to 14 The speed of these interfaces cannot be changed You may need to use attenuators on these single or split interfaces if their optical po...

Страница 7: ...shing Amber Network activity Off No link is established B1 and B2 Green The correct cable is connected to the interface and the connected equipment has power Flashing Green Network activity at the int...

Страница 8: ...he same chassis can be added for redundancy or to increase the number of network interfaces You can also add a second chassis for chassis redundancy Table 2 FortiController 5913C connectors Connector...

Страница 9: ...ons One FortiController 5913C and up to 12 workers The FortiController 5913C receives all sessions and load balances them to the workers If the FortiController 5913C fails the cluster fails Two FortiC...

Страница 10: ...ler 5913C and up to 12 workers in each chassis The FortiController 5913C in one chassis receives all sessions and load balances them to the workers in that chassis If that FortiController 5913C fails...

Страница 11: ...m a two chassis SLBC where each chassis would include a FortiController 5913C in slot 1 and optionally a second FortiController 5913C in slot 2 You then install the workers in slots 3 and up in each c...

Страница 12: ...Controller 5913C session aware load balancing SALB FortiController 5913C system FortiController 5913C Session Aware Load Balancing Cluster SLBC System Guide 12 10 500 259409 20160210 http docs fortine...

Страница 13: ...nstall SR SFP transceivers for normal operation of FortiController 5913C B1 and B2 front panel interfaces The FortiController 5913C ships with two SR SFP transceivers You can also configure the B1 and...

Страница 14: ...right bottom of the FortiController 5913C front panel The mounting components on the left top of the front panel are the same but reversed The FortiController 5913C mounting components align the boar...

Страница 15: ...ard power on and start up correctly FortiController 5913C boards are hot swappable The procedure for inserting a FortiController 5913C board into a chassis slot is the same whether or not the chassis...

Страница 16: ...sides of the chassis slot Closing the handles draws the FortiController 5913C board into place in the chassis slot and into full contact with the chassis backplane The FortiController 5913C front pane...

Страница 17: ...ontroller 5913C mounting components described in FortiController 5913C mounting components on page 14 to remove a FortiController 5913C board from an ATCA chassis slot FortiController 5913C boards are...

Страница 18: ...s flashing and becomes solid blue 7 Open the handles to their fully open positions Opening the handles turns off the microswitch turns off all LEDs and ejects the board from the chassis slot You need...

Страница 19: ...the FortiController 5913C board to use this procedure To complete this procedure you need An ATCA chassis with a FortiController 5913C board installed An electrostatic discharge ESD preventive wrist...

Страница 20: ...ortiController 5913C board is receiving power and the handles are fully closed and you have restarted the chassis and the FortiController 5913C still does not start up the problem could be with FortiO...

Страница 21: ...hould indicate that the boards are functioning normally This chapter includes the following topics SLBC licensing Connecting to the FortiController 5913C GUI Connecting to the FortiController 5913C CL...

Страница 22: ...alancing settings By default you can connect to the FortiController 5913C GUI by browsing to https 192 168 1 99 Connecting to the FortiController 5913C CLI You can connect to the FortiController 5913C...

Страница 23: ...ler 5913C board in chassis slot 1 3 Install the workers in chassis slots 3 4 and 5 4 Power on the chassis 5 Check the chassis and board LEDs to verify that all components are operating normally 6 Chec...

Страница 24: ...as the FortiController 5913C management IP address 12 Connect FortiController 5913C front panel interface F1 to the Internet and front panel interface F2 to the internal network The workers see these...

Страница 25: ...nto the FortiController 5913C GUI going to Load Balance Status and selecting the Config Master icon beside the primary worker which is always the top entry in the Worker Blade list Using the external...

Страница 26: ...e workers in the cluster in a single operation from the worker web based manager The firmware running on all of the workers in the cluster is updated simultaneously 1 Log into the worker web based man...

Страница 27: ...ssage Running Slot 6 Status Working Function Active Link Base Up Fabric Up Heartbeat Managment Good Data Good Status Message Running Slot 8 Status Working Function Active Link Base Up Fabric Up Heartb...

Страница 28: ...ubleshooting how to articles examples FAQs technical notes and more Visit the Fortinet Knowledge Base at http kb fortinet com Comments on Fortinet technical documentation Send information about any er...

Страница 29: ...press or implied except to the extent Fortinet enters a binding written contract signed by Fortinet s General Counsel with a purchaser that expressly warrants that the identified product will perform...

Страница 30: ...this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense WARNING Any changes or modifications...

Отзывы: