Applying Power
Apply power to the frame by depressing the upper half of the rocker switch. When
power is first applied, a red ATTN lamp will light on the front cover while the network
control card is booting. The green LINK lamp will light if the Ethernet connection is
good. The green ACT lamp lights only when a command is received from or sent to the
network.
AC Power Switch OFF Position
ON Position
Front Panel Status LEDs
System fault or booting
Network is connected
ZFCB transmitting/receiving
ACT
ATTN
LINK
Integrity FRM-501 Compact System Frame User Manual
10