5-7
FORMULA
SYSTEM OPERATION AND EQUIPMENT
FASTECH
GENERATOR (OPTIONAL)
Operate the blower for at least four
minutes each time before you start the
generator.
!
WARNING
The generator control panel is mounted on the
DC control panel. The generator control panel
contains the blower switch and the Start/Stop
switch.
The generator is used to provide AC power when
shore power is not available.
1. Make sure the generator seacock is open.
1. Start/Stop Switch
2. Blower Switch
Generator Control Panel
(Configuration varies with models)
Figure 5-7
ON
ON
ON
OFF
12 VOLT DC SYSTEM
START
STOP
GENERATOR ROOM BLOWERS
MAIN
GENERATOR CONTROLS
INT.
LIGHTS
REFIG.
STERO
SYSTEM
WATER
PUMP
WASTE
SYSTEM
12 V0LT
OUTLET
CO
SENSOR
1
2
ON
OFF
OFF
OFF
OFF
FOR144
1. Shore Power Switch
2. Lock
3. Generator Switch
Generator Power Switch
(Configuration varies with models)
Figure 5-8
ON
ON
ON
BATT.
CHARG.
REFRIG. CABIN
OUTLETS
WATER
HEATER
AIR
COND.
REVERSED
POLARITY
OFF
OFF
OFF
OFF
120V 60HZ AC SYSTEM
1
2
3
FOR145
Содержание 2008 5-20 Fastech
Страница 20: ...2 12 FORMULA FASTECH FASTECH...
Страница 46: ...4 16 FORMULA FASTECH FASTECH...
Страница 92: ...7 26 FORMULA FASTECH FASTECH...
Страница 104: ...9 8 FORMULA FASTECH FASTECH...
Страница 108: ...10 4 FORMULA FASTECH FASTECH...
Страница 112: ...11 4 FORMULA FASTECH FASTECH...
Страница 116: ...12 4 FORMULA FASTECH FASTECH...
Страница 117: ...13 1 FORMULA SERVICE LOG Date Hour Reading Service Repairs Performed Section 13 Forms...
Страница 118: ...13 2 FORMULA FASTECH FASTECH FUEL LOG Date Gallons Date Gallons Date Gallons Date Gallons...
Страница 122: ...13 6 FORMULA FASTECH FASTECH NOTES...