background image

KNIGHT

TM

 BOLLARD

SECURITY CORE INSTALLATION INSTRUCTIONS

page 1 of 2  |  Rev. 08-16-16

© 2016 Forms+Surfaces®  |  All dimensions are nominal. Specifications and pricing subject to change without notice. For the most current version of this document, please refer to our website at www.forms-surfaces.com.

T 800.451.0410  |  www.forms-surfaces.com

TOOLS NEEDED

MATERIALS INCLUDED

STEP BY STEP

Create space for footer

• A sufficient footer size depends on frost 
   and other conditions to be determined by 
   the installer. A minimum of an 
   18" x 18" wide x 30" deep footer is 
   recommended.

Position and support security core

• Position security core in desired final 
   location and support so concrete can be 
   poured in hole around security core.
• The bottom of the base plate should be 
   level with the ground surface.
   NOTE: The security core also serves as a 
   conduit path.

Pour concrete footer

• Mix concrete and pour footer according to
   concrete manufacturer’s instructions.
• As soon as footer is poured, verify 
   levelness.
• Allow concrete to cure completely
   according to concrete manufacturer’s
   instructions before removing any
   temporary supports 

or installing fixture.

   NOTE: Security core will need to be free 

of moisture prior to fixture installation.

  

FOR ALL KNIGHT SECURITY BOLLARDS

a

5/32" hex bit

WIDTH

DEPTH

BOTTOM OF 
BASE PLATE 
AT GROUND
LEVEL

level

Отзывы: