11
Forest Garden Ltd, Unit 288 Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB
Maintenance.
Regularly check that all fixings are secure.
Regularly check the quality of the roofing felt and that it is free of holes and splits.
Biocidal Product Regulation (EU 528/2012) Article 58 Information
This article contains timber treated with Celcure AC-500, incorporating biocidal products to give p
rotection against wood destroying insects & wood rotting fungi
.
Contains:
Basic copper carbonate (Copper (II) carbonate – Copper (II) hydroxide (1:1)), Boric acid, Benzalkonium chloride.
Wear gloves when handling freshly treated wood. Avoid breathing dust when cutting treated or untreated wood. Dispose of off-cuts responsibly – do not burn.
7
8
Place the Drip Strip against the front end above door and windows and
secure using 4 x 50mm screws.
Place the roof section on to the shed so that the battens overhang at the front and back
of the building and the sides of the roof are flush with the side panels.
Fix the roof section in place using 4 x 30mm screws at each end and 2 x 40mm screw
for both the front and back screwing through the board into the top of the panels.
9
Place the 1650mm barge board against the sides of the shed. Make sure that
these are in line with the top of the shed and fix each in place ace using 4 x
30mm screws spaced evenly.
Position the remaining 2086mm barge board across the front of the shed,
again so it is in line with the roof, and is flush on the sides. Fix this in place
using 4 x 30mm screws spaced evenly.
10
Cut the roof felt in to two equal lengths and place the first sheet on top of the roof
at the back of the shed making sure there is equal overhang at the sides and
approximately 50mm at the back. Fix the felt in place using the felt tacks spaced in
150mm intervals. Fold and tack the corners.
Repeat for the other sheet making sure it overlaps the first and use felt nails to
fasten the seam.
Fix felt along edge using felt tacks - Trim any overhang felt
F
K
L
M
ATTENTION:
1.THE ROOF IS NOT LOAD
BEARING.
2.TAKE CARE WHEN
CUTTING THE ROOF FELT.
THE ROOF IS NOT LOAD
BEARING
6
12mm Offset
Place and fix the Casement Stay centrally against the inside of the opening
window and make sure it is offset at least 12mm from the to top of the frame so
as not to hit the acrylic sheet. Fix in place using 2 x 25mm screws.
Mark the position of the holes of the casement stay when the window is closed
before fixing the pins in place using the 25mm screws provided.
Before glazing the remaining window place the window frame into the window side
and fix it to the framing using 8 x 40mm screws, making sure that the screw heads
are flush. (Pre-drill)
Glaze the window the same as you have done previously in step 5.