background image

Forest Garden Ltd, Unit 288 Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB

452mm

13

15

16

Issue 01

18

452mm

6mm

floor level

E

x 3

I

Attention.

Take care to make

sure all of the screws

are located into the

framework behind

and do not protrude

Floor level

Attention

Gaps must

be at least

13mm

n

E

x 2

n

Flush

Flush

Notch on

reverse

C

q

E

F

Flush

12

d1

c1

E

E

k1

14

11

Flush

Flush

Ensure screws
locate in to the

ends of the

rafters

b1

D

b1

y

a1

z

F

D

D

D

Attention

Take care

when cutting

or trimming

roof felt.

f1

A

x 90

Brush off any

loose sand

particles once

the felt has

been

installed.

13mm

13mm

13mm

13mm

13mm

Содержание Basil

Страница 1: ...ration and replace in accordance with the manufacturers instructions There are no splits splinters or protruding nails screws prior to each use 3 5 x 50mm Screw Qty 19 3 5 x 40mm Screw Qty 24 3 0 x 25mm Screw Qty 283 B C D E G H 25mm Pan Head Screw Qty 7 IMPORTANT RETAIN FOR FUTURE REFERENCE READ CAREFULLY This is pressure to ensure longevity of all timber building treated components and to protec...

Страница 2: ...80 480mm FLSTRIP1112 1112mm DRBLOCK Qty 2 e f g l m n i j k h s t u p q r o z a1 b1 w x y v d1 e1 c1 PH128FL Qty 4 Profile b c d a 1300mm g1 h1 i1 TG97121180PT ROOF BOARD 1180mm Qty 15 TG97121180 PT GT ROOVE RIM BOARD 1180mm Qty 1 G T TG97121180 PT TT ONGUE RIM BOARD 1180mm Qty 1 T T TG97120565PT ROOF BOARD 565mm Qty 15 TG97120565 PT GT ROOVE RIM BOARD 565mm Qty 1 G T TG97120565 PT TT ONGUE RIM BO...

Страница 3: ...Estate Hartlebury Worcestershire DY10 4JB a D Flush 1 2 3 D c e f d Flush p D D D D D D D D D D D D Use the bench p to measure the placement of panel b accurately b 1052mm g D D D 480mm j1 4 d c e b k j l C C Window Assembly Flush D D D Issue 0118 ...

Страница 4: ...ush with rafter f1 B g1 h1 i1 E E x 2 x 2 E Flush 6 7 i h r D D D x 4 D x 4 D B D D D F D D D F D F D F D F D F D F D F D F D F D F D F D F D F D Please ensure that all the screws locate into the floor bearers underneath TOP VIEW Fix the panels to the floor 8 Flush 9 j1 g g D 5 10 D D x 3 ...

Страница 5: ...to the framework behind and do not protrude Floor level Attention Gaps must be at least 13mm n E x 2 n Flush Flush Notch on reverse C q E F Flush 12 d1 c1 E E k1 14 11 Flush Flush Ensure screws locate in to the ends of the rafters b1 D b1 y a1 z F D D D Attention Take care when cutting or trimming roof felt f1 A x 90 Brush off any loose sand particles once the felt has been installed 13mm 13mm 13m...

Страница 6: ...tform DO NOT CLIMB 18 Flush G F x 2 Flush with front of the door frame C C 352mm 40mm o 19 e1 D x 2 17 Offset 20mm from the hinge side of the panel 20mm Attention Take care to make sure all of the screws are located into the framework behind and do not protrude Flush w ...

Отзывы: