background image

BASIL PLAYHOUSE

REQUIRED TOOLS: (NOT SUPPLIED)

Issue 01

18

PHTPA84

Instruction Reference

Fixing Pack (PHTPA84FP)

Not to Scale

Important :

Assembly of this
product requires

a minimum of two

adults only

.

Warning. Only for domestic use

Biocidal Product Regulation (EU 528/2012) Article 58 Information

This article contains timber treated with Tenalith, incorporating biocidal
products to give protection against wood destroying insects & wood rotting
fungi.

Contains:

Basic copper carbonate (Copper (II) carbonate – Copper (II)

hydroxide (1:1)), Boric acid, Benzalkonium chloride.

Wear gloves when handling freshly treated wood. Avoid breathing dust when
cutting treated or untreated wood. Dispose of off-cuts responsibly – do not
burn.

Slipping, Tripping

& Falling

TAPE MEASURE

SHARP KNIFE

DRILL/POZI DRIVE

SCREWDRIVER

Must

Pre-drill

SPIRIT LEVEL

3.5 x35mm Screw Qty 83

3.0 x 20mm Screw Qty 14

10mm Clout Nail Qty 90

G

A

I

HAMMER

Magnetic

Catch and Plate

Qty 2

Hinge Qty 4

Maintenance:

- Make sure that there are no sharp edges or nail / screws protruding
- Make sure that any sharp edges are sanded before use.
- Shake felt to remove any loose grit, prior to assembly of playhouse.

Regularly check

- All fixings are tight.
- All parts for evidence of deterioration and replace in accordance with the
manufacturers instructions.
- There are no splits, splinters, or protruding nails / screws  prior to each use.

3.5 x 50mm Screw Qty 19

3.5 x 40mm Screw Qty 24

3.0 x 25mm Screw Qty 283

B

C

D

E

G

H

25mm Pan Head Screw Qty 7

IMPORTANT, RETAIN FOR FUTURE REFERENCE; READ

CAREFULLY

- This

is pressure

to ensure longevity of all timber

building

treated

components and to protect against rot. This may leave a colour
difference on some parts that will even out as the moisture content
stabilises This will not need additional treatment.

.

- Timber is a natural material. It will shrink and swell as a result of
varying moisture content.
- Please keep all plastic bags and small parts away from children
- This product must be built on a level base and at least two metres
away from any structure or obstruction.

Warnings

-This product is for outdoor use only.
-This product is intended for use by children of up to age 10 years.
-Only for domestic use

Technical Help line:

7777 089

8.30 am and 5.00 pm  Monday to

0333

Friday.

In line with your statutory rights, please check all parts prior to
assembly, as assembly of damaged parts may be deemed to be
acceptance and this may affect the remedies you are entitled to.
The manufacturer does not accept any liability for injury or damage to
property caused by this product not being constructed in accordance
with our instructions or being altered in anyway.

Содержание Basil

Страница 1: ...ration and replace in accordance with the manufacturers instructions There are no splits splinters or protruding nails screws prior to each use 3 5 x 50mm Screw Qty 19 3 5 x 40mm Screw Qty 24 3 0 x 25mm Screw Qty 283 B C D E G H 25mm Pan Head Screw Qty 7 IMPORTANT RETAIN FOR FUTURE REFERENCE READ CAREFULLY This is pressure to ensure longevity of all timber building treated components and to protec...

Страница 2: ...80 480mm FLSTRIP1112 1112mm DRBLOCK Qty 2 e f g l m n i j k h s t u p q r o z a1 b1 w x y v d1 e1 c1 PH128FL Qty 4 Profile b c d a 1300mm g1 h1 i1 TG97121180PT ROOF BOARD 1180mm Qty 15 TG97121180 PT GT ROOVE RIM BOARD 1180mm Qty 1 G T TG97121180 PT TT ONGUE RIM BOARD 1180mm Qty 1 T T TG97120565PT ROOF BOARD 565mm Qty 15 TG97120565 PT GT ROOVE RIM BOARD 565mm Qty 1 G T TG97120565 PT TT ONGUE RIM BO...

Страница 3: ...Estate Hartlebury Worcestershire DY10 4JB a D Flush 1 2 3 D c e f d Flush p D D D D D D D D D D D D Use the bench p to measure the placement of panel b accurately b 1052mm g D D D 480mm j1 4 d c e b k j l C C Window Assembly Flush D D D Issue 0118 ...

Страница 4: ...ush with rafter f1 B g1 h1 i1 E E x 2 x 2 E Flush 6 7 i h r D D D x 4 D x 4 D B D D D F D D D F D F D F D F D F D F D F D F D F D F D F D F D F D Please ensure that all the screws locate into the floor bearers underneath TOP VIEW Fix the panels to the floor 8 Flush 9 j1 g g D 5 10 D D x 3 ...

Страница 5: ...to the framework behind and do not protrude Floor level Attention Gaps must be at least 13mm n E x 2 n Flush Flush Notch on reverse C q E F Flush 12 d1 c1 E E k1 14 11 Flush Flush Ensure screws locate in to the ends of the rafters b1 D b1 y a1 z F D D D Attention Take care when cutting or trimming roof felt f1 A x 90 Brush off any loose sand particles once the felt has been installed 13mm 13mm 13m...

Страница 6: ...tform DO NOT CLIMB 18 Flush G F x 2 Flush with front of the door frame C C 352mm 40mm o 19 e1 D x 2 17 Offset 20mm from the hinge side of the panel 20mm Attention Take care to make sure all of the screws are located into the framework behind and do not protrude Flush w ...

Отзывы: