6
8
Forest Garden Ltd, Units 291 & 296 Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB
Trim off any excess felt that may protruding beneath
the barge boards.
5
7
F
Place the roof board onto a 1540mm batten making sure that the board is
flush on all sides. Fix the batten in place using 4 x 25mm screws.
Repeat for the other roof section.
Maintenance.
We recommend that you treat your shed at the beginning of each season with a
wood preservative treatment. Apply in
accordance with the manufacturers instructions.
Regularly check all fixings are secure.
Biocidal Product Regulation (EU 528/2012) Article 58 Information
This article contains timber treated with Celcure AC-500, incorporating biocidal products to give p
rotection against wood destroying insects & wood rotting fungi.
Contains:
Basic copper carbonate (Copper (II) carbonate – Copper (II) hydroxide (1:1)), Boric acid, Benzalkonium chloride.
Wear gloves when handling freshly treated wood. Avoid breathing dust when cutting treated or untreated wood. Dispose of off-cuts responsibly – do not burn.
J
Lift the roof sections into place ensuring that
they are in line with the apex and the front and
back panels of the shed.
Fix the roof section in place using 3 x 25mm
screws for each end and 3 x 30mm screws for
the sides. Make sure the screws locate into the
framing.
Repeat for the other roof section.
Attention
Take care when cutting and
trimming the roof felt
Apex
Eaves
K
I
J
Unroll the felt and cut it into two equal lengths. Place each
section so that they overlap at the apex and overhang on the
eaves by approximately 50mm. Fix the felt to the roof using felt
nails spaced in 150mm intervals along the edges and the
seam. Make sure that the felt nails are positioned so that each
locates into the batten on the eaves. Cut and fold the corners
securing with a single felt nail.
Place the barge boards against the ends of the shed
so that they are flush with the overhang of the roof
and in line with the top. Fix each in place using
3x30mm screws.
Place the finials over the joins making sure they are
centred. Secure in place using 2x30mm screws for
each. (Make sure you pre-drill)