INSTALLATION PROCEDURE / STEP 2
2
Set the 9/16" setting blocks as the picture indicates and set the door glass on top of the
setting blocks (16). Be sure to keep the door level while marking the hole locations for drilling both
vertically and horizontally.
- 4 -
LEFT HAND ASSEMBLY
RIGHT HAND ASSEMBLY
Содержание MARINA MRHG-CL
Страница 2: ...1 1 3 8 Countersunk Screw 2 3 4 Countersunk Screw 1 1 2 Countersunk Screw...
Страница 23: ...1 Tornillo avellanado de 1 3 8 Tornillo avellanado de 2 3 4 Tornillo avellanado de 1 1 2...
Страница 44: ...1 Vis t te frais e de 1 3 8 po Vis t te frais e de 2 3 4 po Vis t te frais e de 1 1 2 po...