background image

R2-3

R2-6

R2-7

R4-1

R2-2

bk

bl

g

R8-2

g

R7-1

g

R7-2

v

R5-1

v

R5-2

L1

L3

L5

bk

R1-3

MN

Fu1

1

2

R3-6

r

R3-5

br

R3-4

a

PC

12

11

10

9

TS

R3-2

gn

R6-1

y

R6-2

v

R3-1

v

R3-3

y

R2-5

R2-4

R2-1

g

R8-1

R4-2

R4-3

r

R1-4

3

4

5

TM

R

7

6

PA

br

bl

R1-1

br

R1-2

bl

R6-4

br

R6-3

IG

L4

L1

N

S3

BR

N

PCB 1

(2)PR6

(3)PR5

TA

F

N

230Vac
50Hz

MT

L

N

bl

(1) PR1

(4) PR3

2

1

1a

2a

C

1

2

C

1

2

2

C

br

ygn

bl

bl

br

3.5.3 Topographical  layout

Key to symbols: 

IG:  

Main switch [on the printed circuit it is indicated with “on/off”]

L1:  

Low water light (optional)

L3:  

Heating pump light

L4:  Burner 

light

L5:  Overheating 

light

L6:  

Burner stop light (optional)

MT:  

Programming clock motor (optional) [indicated with TIMER on 
the PCB]

TM:  

Programming clock contact (optional) [indicated with TIMER 
on the PCB]

PA:  

Water pressure switch [on the printed circuit it is indicated with 
the water presure switch symbol]

MN:   Minimum temperature thermostat (optional) [on the printed 

circuit it is indicated with Tm]

TA:  Room 

thermostat

R:  

Heating thermostat [on the printed circuit it is indicated with 
Tr]

 
TS:  Safety 

thermostat

Fu1:   Safety fuse type F4A 250V

BR:  Burner

PC:  

Heating system circulating pump

PCB1:  Heating system printed circuit

Notes:  (1) PR1: Remove jumper and connect PA
 

(2) PR6: Remove jumper and connect TM

 

(3) PR5: Remove jumper and connect MN

 

(4) PR3: Remove jumper and connect TA

14

pic. 10

Содержание ELBA DUAL 23

Страница 1: ...INSTALLATION USE AND MAINTENANCE ELBA DUAL GB IST 03 C 202 01...

Страница 2: ...hank you for choosing our boilers Please read these installation and maintenance instructions with care Please note that the boiler must only be installed repaired and serviced by qualified personnel...

Страница 3: ...All the packaging mate rials can be recycled and should be sent to specific waste management sites Keep the packaging out of the reach of children as it constitutes a serious hazard In the event of a...

Страница 4: ...Packaging page 10 3 2 2 Choosing where to install the boiler page 10 3 2 3 Installing the boiler page 10 3 2 4 Room ventilation page 10 3 2 5 Flue gas system page 10 3 2 6 Choosing and installing the...

Страница 5: ...s light is on it means the safety thermostat has cut in due to overheating and needs to be reset manually Burner light yellow E This light indicates that the burner is in operation Thermometer F The t...

Страница 6: ...t a quali fied technician or an authorised Service Centre 1 2 3 Shutdown due to overhea ting If red light D comes on due to overheating it means the safety thermostat has cut in due to a recurrent mal...

Страница 7: ...22 July 1993 and are fitted with all the safety features required by the applicable laws The main technical features of the boilers are listed below High efficiency cast iron heat exchanger with 3 sm...

Страница 8: ...285 4 FORI M8 110 150mm 65mm 57 486 5 mm mm mm 82 5 mm 235 mm 627 mm 225 mm 65mm 82 5 mm MODEL L Flow A Return B 23 400 1 1 4 1 33 525 1 1 4 1 43 625 1 1 4 1 53 700 1 1 4 1 63 800 1 1 4 1 73 900 1 1 4...

Страница 9: ...rate l h 680 950 1230 1520 1800 2150 Combustion chamber length mm 208 308 408 508 608 708 Flue gas temperature C 210 190 188 202 181 175 Flue gas flow rate Kg h 40 53 2 69 3 8 1 97 7 114 5 Working pr...

Страница 10: ...allet pic 3 Pass belts or cables underneath the boiler and around the legs lift it off the pallet and place it in position on the ground Attention when lifting the boiler from the pallet hold it to pr...

Страница 11: ...gs when the boi ler is running at a steady state 3 2 8 Connecting to the gas mains for boilers with gas bur ners The cross section of the gas sup ply pipe must be equal to or grea ter than that of the...

Страница 12: ...Gradually open the water inlet tap and check that the relief valves in the system if there are any are working properly Close the radiator air vents as soon as water starts to come out Check on the p...

Страница 13: ...Room thermostat connection Water pressure switch connection Electric feeding 3 5 2 General layout a light blue bl blue bk black br brown g grey gn green r red v purple y yellow ygn yellow green IG F...

Страница 14: ...L5 Overheating light L6 Burner stop light optional MT Programming clock motor optional indicated with TIMER on the PCB TM Programming clock contact optional indicated with TIMER on the PCB PA Water pr...

Страница 15: ...iler cold the boiler as a whole the burner this may also need to be reset according to the manu facturer s instructions see combu stion check boiler room ventilation grille flue gas side of the heat e...

Страница 16: ...Fax 39 0365 878 576 e mail info fondital it www fondital it The MANUFACTURER reserves the right to implement any necessary and or useful variation to products without modifying fundamental characteri...

Отзывы: