background image

GAS

G 1/2”

G 1/2”

G 1/2”

G 1/2”

RETURN

G 1”

G 1”

G 1”

G 1”

FEED

G 1”

G 1”

G 1”

G 1”

Model

RTFS E 18

RTFS E 24

RTFS E 32

RTFS E 36

L

510

510

610

610

2.2 Dimensions

7

fig. 2

Содержание BALI RTFS E 18

Страница 1: ...BALI RTFS IST 03 C 080 01 INSTALLATION OPERATION AND MAINTENANCE CE 49BN3788 GB...

Страница 2: ...1 Dear Customer Thank you for choosing and buying one of our boilers Please read these instructions carefully in order to install operate and maintain this equipment properly...

Страница 3: ...o specific separated collection areas Keep the packing out of reach of chil dren as by its very nature it may constitute a source of danger Should the equipment break down and or function defectively...

Страница 4: ...3 2 1 Packing pag 9 3 2 2 Choosing the installation position for the boiler pag 9 3 2 3 Installing the Boiler pag 9 3 2 4 Ventilation of Boiler Rooms pag 9 3 2 5 Smoke stack system pag 9 3 2 6 On site...

Страница 5: ...tioning It must be reset manually Burner cut out LED Red 6 This light indicates that the burner safety device has tripped due to a malfunction Burner operation LED Yellow 7 This light indicates that t...

Страница 6: ...fety thermo stat cut out has tripped and must be reset manually This is due to an operating fault and an authorised Service Centre or qualified person nel must be contacted for mainte nance 1 2 4 Cut...

Страница 7: ...ed for in the current stan dards for this type of product The main technical characteristics of the BALI boiler are listed below High performance cast iron heat exchanger Insulation in glass wool with...

Страница 8: ...GAS G 1 2 G 1 2 G 1 2 G 1 2 RETURN G 1 G 1 G 1 G 1 FEED G 1 G 1 G 1 G 1 Model RTFS E 18 RTFS E 24 RTFS E 32 RTFS E 36 L 510 510 610 610 2 2 Dimensions 7 fig 2...

Страница 9: ...V Hz W A C Kg h N mm mm mbar Stm3 h mm C Kg h N mm mm mbar kg h EC Performance Class EC PIN Category Type Thermal Power Thermal Capacity Performance at nominal load Performance at reduced load 30 Main...

Страница 10: ...ler to the system s feed and return pipes Remember that the plumbing system must include all the safety and control elements required in terms of current standards safety valve water pressure switch h...

Страница 11: ...smoke flue pipe must be at least 250 mm and both terminals are to be positioned within a square with 500 mm sides The smoke flue is to comply with cur rent standards Air intake smoke flue double 80 mm...

Страница 12: ...mp to prevent it being torn out This boiler must be connected to a 230V 50Hz electrical power supply When forming the connection respect the phase neutral polarity Installation standards must be com p...

Страница 13: ...with a drain stopcock at the front of the unit that can be used to empty the system 3 4 Starting the Boiler 3 4 1 Preliminary Checks Before starting the boiler it is best to check that The smoke flue...

Страница 14: ...R on the printed circuit VG Gas valve TM Contact Timer optional mar ked TIMER on the printed cir cuit PZ Ignition spark unit PA Water pressure switch optio nal marked with the pressure switch symbol o...

Страница 15: ...that indicates the type of gas and pres sure for which the equipment is set 4 MAINTENANCE In order to ensure that the equip ment is efficient and that it functions correctly maintenance must be car ri...

Страница 16: ...ocenigo 123 Tel 0365 878 31 Fax 0365 878361 e mail fondital fondital it export01 fondital it www fondital it Fondital reserves the right to make any changes it deems necessary without notice Fondital...

Отзывы: