background image

Recommended daily dispenser cleaning
1.  Remove all debris from drain pan.
2.  Pour 1 gallon (4 L) hot water into drain pan to keep drain lines clear.

Recommended weekly dispenser cleaning
1.  Remove drain pan and grille and wash with Solution A. Rinse thoroughly.
2.  Remove nozzles and diffusers from valves, soak for at least 10 minutes in cleaning Solution A, rinse, 
 

sanitize with Solution B and reinstall.

3.  Pour a solution of one cup (8 oz/237 ml) household bleach mixed with one gallon (3.8 L) hot water into 
 

drain pan to help prevent algae growth in drain lines.

Recommended quarterly dispenser cleaning
1.  Remove top from dispenser and turn power switch to OFF position.
2.   Remove ice from storage area.
3.  Remove dispense chute cover, chute, auger motor assembly, auger and auger tube (see Service section).
4.  Remove drain pan, grille and dispense wheel (see Service section).
5.   Clean all components and bin storage area with Solution A, rinse thoroughly with clear water and sanitize 
 

with Solution B.

6.  Remove nozzles and diffusers from valves, soak for at least 10 minutes in cleaning Solution A, rinse, 
 

sanitize with Solution B and reinstall.

 
For units with integral ice-water bath beverage cooling only:
1.  Remove dispenser lid and counter access panel opposite ice tower side.
2.  Disengage service drain tube (on utility connection side of dispenser) from mounting bracket.
3.  Pull bath service drain tube down through beverage line opening in counter and drain water bath into a bucket.
4.  Use a bottle brush to clean coils with Solution A, rinse and sanitize with Solution B.
5.  Reposition ice water bath drain tube in up position so water does not drain out.
6.  Pour Solution A into ice water bath until it flows out of bath overflow drain.
7.  Turn power ON to unit and dispense a small cup of ice to activate pump.
8.  Allow pump to run for two minutes to clean pump and pump lines.
9.  Turn power OFF.
10. Drain bath and replace drain tube in mounting bracket in up position to avoid siphoning water bath water.

Putting unit back in service after quarterly cleaning
1.  On units with integral beverage cooling, fill ice water bath with water until water spills out of  
 

bath overflow drain.

2.  Reassemble components.
3.  For manual load units, fill unit with an approved ice (see important cautions on page 4). 
4.  For automatic load units with 400A/W (R404A refrigerant) ice machines, turn bin signal switch(es) and 
 

dispenser power switch to ON position and allow storage area to fill.

5.  Dispense and discard all ice, verifying dispenser is functioning properly.

Recommended quarterly cleaning of optional ice machine.
Units equipped with optional ice machines require cleaning of ice machine system at least every six months, and 
more often if local water conditions dictate. Failure to clean ice machine system will result in decreased performance 
and potential damage to ice machine. Refer to Ice machine Installation, Operation and Service Manual.

10

Содержание VU155 Seris

Страница 1: ...Dispensers 00119636R08 801 Church Lane Easton PA 18040 USA Toll free 877 612 5086 1 610 252 7301 www follettice com Following installation please forward this manual to the appropriate operations per...

Страница 2: ...ional ice machine Connecting beverage lines Operation How the dispenser works Cleaning Service Dispense chute cover removal Auger motor assembly removal Gate assembly removal Auger and auger tube remo...

Страница 3: ...cautions For indoor use only Storage area of dispenser contains mechanical moving parts Keep hands and arms clear of this area at all times If access to this area is required power to unit must be di...

Страница 4: ...VC pipe nipple for bin drain 3 4 PVC pipe nipple for drain pan drain 1 ID hose for beverage bath drain Beverage connections 1 4 ID syrup beverage hose 3 8 ID carbonated water beverage hose 3 8 ID plai...

Страница 5: ...ters this side 12 305 mm minimum between dispenser side s and optional ice machine s 5 Side View Front View 37 25 ice transport tube 10 valve unit 947mm Manual load unit 31 25 794mm 49 75 1264mm 21 75...

Страница 6: ...er where it meets counter Smooth sealant to a 1 8 4 mm radius 8 Install a PVC drain line with at least a 1 4 per foot 20 mm per 1 m slope Insulate drain line to prevent condensation Note Do not apply...

Страница 7: ...water into ice water bath area to fill empty bath and submerge coils Coils are submerged when water starts to flow out overflow drain DO NOT SPLASH WATER ON ELECTRICAL BOX Once filled with water add...

Страница 8: ...ice machine off to avoid overfilling of the bin The ice machine will restart after 20 minutes if the bin is calling for ice Units with integral ice water bath beverage cooling are equipped with a wat...

Страница 9: ...ning solution Fill a second clean product tank with potable rinse water 1 Disconnect all syrup lines from product containers 2 Connect syrup line 1 to cleaning solution tank pressurize tank to 20 50 p...

Страница 10: ...3 Pull bath service drain tube down through beverage line opening in counter and drain water bath into a bucket 4 Use a bottle brush to clean coils with Solution A rinse and sanitize with Solution B 5...

Страница 11: ...removal Fig 3 1 Remove auger motor and dispense mechanism assembly see above 2 Pull auger upward to clear auger tube 3 Lift auger tube upward to clear dispenser top 4 Slide tube and bearing plate thr...

Страница 12: ...LUE 24VAC YEL BATH SOL NC GREEN COLD RED WARM BROWN NO B A T1 DISPENSE SWITCH C NO 24V RED RED PL6 1 RED 24VAC RED BATH SOL C RED RED SENSOR R1 T RED DISPENSE TEMP 115 VOLTS 24 VOLTS BROWN STATUS LIGH...

Страница 13: ...roblem 6 Faulty or disconnected wiring Solution 1 Turn power switch to ON position check connections 2 Replace switch 3 Replace transformer 4 Check pan and reset 5 Replace switch 1 Check connections 2...

Страница 14: ...ed Ice will be dispensed into the water bath for 12 seconds then stop for 60 seconds The pump will stay energized and the circuit board will then monitor the water temperature If it is below the set p...

Страница 15: ...valve unit 502450 Not shown Grille drain pan 10 valve unit 502451 8 Cover ice storage bin rear all U155 units except N units 502452 Not shown Cover ice storage under drain pan all U155 units 502453 9...

Страница 16: ...y bath LH unit 502449 Not shown Dispense mechanism assembly non bath RH unit 502458 Not shown Dispense mechanism assembly non bath LH unit 502496 7 Spring dispense mechanism 1 per side 501950 8 Chute...

Страница 17: ...rb 10 valve 00124701 7 Manifold carbonated water 8 valve 00207539 Not shown Manifold carbonated water 10 valve 00207540 8 Manifold water 8 valve 00123331 Not shown Manifold water 10 valve 00123141 9 S...

Страница 18: ...shown Seal wheel motor 501333 Not shown Spacer wheel motor 501768 Not shown Capacitor wheel motor 501782 7 Agitator rotating 21 534 mm long 502484 8 Plate wheel motor mounting 502615 9 Agitator statio...

Страница 19: ...pper and lower 501314 7 Cover and bearing chain drive includes 501314 502481 8 Capacitor 25mf 270V 501550 9 Key Woodruff 502482 10 Washers thrust 4 501765 11 Mounting plate auger motor includes 501314...

Страница 20: ...ot shown Bracket safety switch rear 502608 Not shown Bracket safety switch drain pan RH 502609 Not shown Bracket safety switch drain pan LH 502610 Not shown Thermostat bin level 500514 Not shown Conve...

Отзывы: