background image

Welcome to Follett Corporation 
Important cautions
Specifi cations

 

Installation

 

 

Installing dispenser in counter  

 Electrical 

connections

 

Field wiring diagrams

 

Connecting beverage lines

 

Installing optional icemaker

Operation
 

How the dispenser works

 Cleaning

Service

 

 

Dispense chute cover removal

 

Auger motor assembly removal

 

Gate assembly removal

 

Auger and auger tube removal

 

Dispenser wheel removal

 Wiring 

diagrams

Troubleshooting
Replacement parts

 

3

Table of contents

4
4
5
7
7
8
8
9
9

10
10

11

13
13
13
13
13
13
14
15
17

Follett Corporation
Equipment Return Policy

Follett equipment may be returned for credit under the following conditions:
1. 

The equipment is new and unused.

2. 

A return authorization number has been issued by customer service.

3. 

Follett receives the equipment at the factory in Easton, PA within 30 days of the issue of the return authorization number.

4. 

The equipment must be returned in Follett packaging. If the packaging has been damaged or discarded, Follett will forward, at the customer’s 
expense, new packaging.

Note:

 

Return freight charges are the responsibility of the customer. If equipment is returned and is damaged because of improper packaging, Follett 
Corporation will not be held responsible.

Credit will be issued when:
The equipment has been inspected by Follett and deemed suitable to be returned to stock. 

Note:

 

A 15% restocking charge will be deducted from the credit. If the cost to return the product to stock exceeds 15%, the actual cost will be 
deducted. 

Содержание U155

Страница 1: ...load unit with one icemaker Automatic load unit with two icemakers Installation Operation and Service Manual U155 Series Ice and Beverage Dispensers 208598R05 801 Church Lane Easton PA 18044 USA Toll...

Страница 2: ...2 This page intentionally left blank...

Страница 3: ...1 The equipment is new and unused 2 A return authorization number has been issued by customer service 3 Follett receives the equipment at the factory in Easton PA within 30 days of the issue of the r...

Страница 4: ...ands and arms clear of this area at all times If access to this area is required power to unit must be disconnected first Ice is slippery Maintain counters and floors around dispenser in a clean and i...

Страница 5: ...pipe nipple for bin drain 3 4 PVC pipe nipple for drain pan drain 1 ID hose for beverage bath drain Beverage connections 1 4 ID syrup beverage hose 3 8 ID carbonated water beverage hose 3 8 ID plain w...

Страница 6: ...side s and optional icemaker s 6 DO NOT CONNECT TO DRAIN SYSTEM 6 min 27 375 696mm ice transport Side View Front View tube entrance 6 153mm 25 8 656mm bin signal power 8 75 223mm 3 4 PVC slip joint dr...

Страница 7: ...ad approximately 1 4 6mm in diameter of NSF listed silicone sealant Dow Corning RTV 732 or equivalent around perimeter of dispenser where it meets counter Smooth sealant to a 1 8 4mm radius 8 Install...

Страница 8: ...r 15 amps max fuse size 2 icemakers 20 amps max fuse size each Field wiring diagrams Note Field wiring diagrams are intended to aid electricians or technicians in understanding how equipment works All...

Страница 9: ...e coils Coils are submerged when water starts to flow out overflow drain DO NOT SPLASH WATER ON ELECTRICAL BOX Once filled with water add ice to bath until ice covers top of waterbath 3 For manual loa...

Страница 10: ...ps by gravity into the container In automatic load units ice is manufactured in either one or two Follett remote icemakers These icemakers may be located up to 20 ft 6m away from the dispenser Extrude...

Страница 11: ...23L of cleaning Solution A Fill a clean product tank with cleaning solution Fill a second clean product tank with potable rinse water 1 Disconnect all syrup lines from product containers 2 Connect sy...

Страница 12: ...racket 3 Pull bath service drain tube down through beverage line opening in counter and drain water bath into a bucket 4 Use a bottle brush to clean coils with Solution A rinse and sanitize with Solut...

Страница 13: ...auger tube removal Fig 3 1 Remove auger motor and dispense mechanism assembly see above 2 Pull auger upward to clear auger tube 3 Lift auger tube upward to clear dispenser top 4 Slide tube and bearin...

Страница 14: ...9 RED 6 T RED RED C NO 24VAC RED TEMP BATH SOL C DISPENSE SWITCH PL6 3 BROWN T1 RED PL6 1 RED 24 V RED 4 DISPENSE ORANGE L2 PURPLE RED CLOCKWISE ROTATION PL3 3 BLK WHT M2 BLUE WHEEL MOTOR L2 BLUE R2 7...

Страница 15: ...ed problem 6 Faulty or disconnected wiring Solution 1 Turn power switch to ON position check connections 2 Replace switch 3 Replace transformer 4 Check pan and reseat 5 Replace switch 1 Check connecti...

Страница 16: ...ergized Ice will be dispensed into the waterbath for 12 seconds then stop for 60 seconds The pump will stay energized and the circuit board will then monitor the water temperature If it is below the s...

Страница 17: ...es 501409 Not shown Key beverage lock switch 501286 10 Panel end beverage RH unit 502584 Not shown Panel end beverage LH unit 502583 Not shown Panel access RH and LH units 502585 Not shown Panel rear...

Страница 18: ...assembly bath LH unit 502449 Not shown Dispense mechanism assembly non bath RH unit 502458 Not shown Dispense mechanism assembly non bath LH unit 502496 7 Spring dispense mechanism 1 per side 501950...

Страница 19: ...udes 2 elbows 00109348 6 Elbow overflow drain 1 26mm x 3 4 MPT 502465 Not shown Elbow clean out drain 3 8 10mm x 3 8 MPT 502466 7 Manifold carbonated water 8 valve unit 502468 Not shown Manifold carbo...

Страница 20: ...r wheel 502560 Not shown Seal wheel motor 501333 Not shown Spacer wheel motor 501768 Not shown Capacitor wheel motor 501782 7 Agitator rotating 21 534mm long 502484 8 Plate wheel motor mounting 502615...

Страница 21: ...35 22T 5 8 bore 502478 4 Sprocket 35 12T 5 8 bore 502479 5 Drive shaft 502480 6 Bearing auger upper and lower 501314 7 Cover and bearing chain drive includes 501314 502481 8 Capacitor 25mf 270V 501550...

Страница 22: ...shown Switch safety drain pan assembly LH unit 502500 Not shown Switch safety drain pan assembly RH unit 502501 Not shown Switch dispense lever 502505 Not shown Bracket safety switch rear 502608 Not...

Страница 23: ...This page intentionally left blank 23...

Страница 24: ...208598R05 06 09 801 Church Lane Easton PA 18044 USA Toll free 800 523 9361 610 252 7301 Fax 610 250 0696 www follettice com...

Отзывы: