Installation
Uncrating cart
1. Remove paddle from skid by cutting plastic straps.
2. Cut strap holding front axle to skid.
3. Remove wheel chocks from skid at handle end of cart.
4. Roll cart(s) out of base section.
5. Remove tape holding lid to cart.
6. Remove lid storage bracket(s) from inside cart. (Brackets may be installed on left or right side of bin.
See Installing Bin section.)
Uncrating and installing base section
1. Remove screws holding fl anged feet and tie-down straps to skid and remove skid.
2. Remove packing material from inside of legs and around shutter door.
3. Position base in intended position and adjust feet to level unit in both directions.
4. Mark position of each fl anged foot anchoring hole.
5. Move base out of way and install anchors for 1/4" bolts in fl oor (supplied by others).
6. Reposition unit in intended position and anchor base unit to fl oor through fl anged feet.
Installing bin
1. Remove 4 bolts fastening skid to underside of bin.
2. Remove all protective wrap from exterior.
3. Run 1/8" bead of supplied silastic in center of each gasket
band on base.
4. Install bin section on base section, taking care that locating
pins in base engage holes in bin.
5. Use fasteners provided to install paddle support bracket on
right or left side of bin in holes provided.
6. Remove paper from back of cart lid storage bracket(s) and position
brackets on side of bin.
7. Remove all tape and temporary fastenings from door assemblies
and outside of bin.
8. Mount icemaker(s) on top of bin in accordance with icemaker
manufacturer's instructions.
9. Install tie-down straps.
Installing tie-down straps
1. Remove screws from rivnuts on each side of bin section.
2. Reposition tie-down strap up until slot matches rivnut opening.
3. Reinstall screws in rivnuts and tighten.
When leveling, do not extend any leg more than 1" (26mm) for total leg height no greater than
2.125" (54mm).
Legs must be secured to fl oor through feet to avoid possible movement and resulting injury.
!
bin
section
base
section
locating pin
bead of
silastic
gasket
gasket
bead of
silastic
4
Tie-down straps to secure bin to base are provided on each side of unit. Straps MUST be
installed to avoid possible injury should unit move. Bolt unit to wall for increased stability, and
bolt to fl oor to prevent side-to-side movement.
!
Содержание SmartGATE ITS1350-60
Страница 2: ...2 Contents Welcome to Follett 3 Installation 4 Operation 6 Cleaning 9...
Страница 16: ...Indice Instalaci n 4 Funcionamiento 6 Limpieza 9 Piezas 11 2...
Страница 30: ...Table des mati res Installation 4 Fonctionnement 6 Nettoyage 9 Pi ces de rechange 11 2...
Страница 43: ...Fran aise 15 Cette page est laiss e vierge intentionnellement...