HCD1010R/N, HMF1010R/N, HCD1410R/N, HMF1410R/N
25
Fig. 23
22. Install shuttle switch.
§
Align holes with pins (Fig. 23.1) and depress switch
button (Fig. 23.2) to clear shuttle tab.
Fig. 24
23. Install shuttle drain tube and front feed water tube
(Fig. 24).
Fig. 25
24. Install main housing insulation and shuttle insulation:
25. Apply a coat of petro gel to auger shaft.
Содержание Horizon Elite HCD1010R/N
Страница 2: ...2 HCD1010R N HMF1010R N HCD1410R N HMF1410R N...
Страница 8: ...8 HCD1010R N HMF1010R N HCD1410R N HMF1410R N Condensing unit 36 25 921 mm 25 5 648 mm 26 08 662 mm...
Страница 36: ...36 HCD1010R N HMF1010R N HCD1410R N HMF1410R N 2 12 1 4 9 5 3 8 13 14 7 11 6 10 15 16 Low side assembly...
Страница 38: ...38 HCD1010R N HMF1010R N HCD1410R N HMF1410R N Electrical box 1 7 4 3 2 8 6 5...
Страница 42: ...42 HCD1010R N HMF1010R N HCD1410R N HMF1410R N Skins assembly 10 5 4 3 6 8 7 11 9 2 1...
Страница 48: ...48 HCD1010R N HMF1010R N HCD1410R N HMF1410R N...
Страница 49: ...HCD1010R N HMF1010R N HCD1410R N HMF1410R N 49...