6
remote condensing
BIN • TOP-MOUNT
Prepare the bin.
3
Bin preparation
• Remove protective tape from
gaskets
Bin top preparation
3.1
➋
➊
➊
➌
• Apply gaskets
➊
• Install shuttle actuator
➋
through bin top
and secure with locking nut
➌
Bin top preparation
3.2
Prior to installing the docking assembly,
ensure that the drain fitting is oriented (right
or left) correctly for your installation. An
optional straight drain fitting is also supplied.
You may need to remove the back panel of
the docking assembly in order to re-orient or
change the drain fitting. Replace back panel
prior to mounting the docking assembly.
BEFORE PROCEEDING