DISABLED REFUGE EVC
PAGE ii
3-ZONE REFUGE EVC SYSTEM MANUAL V1.00
File:DR 7700-000 SM7 V100 Refuge EVC Manual 3-Zone.Docx E+EO (c) 2018 Folknoll Group Ltd
PAGE ii
7.1
AUTOMATIC SYSTEM TEST .................................................................................................................................. 14
7.2
AUDIO PATH TEST TRIGGERED MANUALLY ......................................................................................................... 14
7.3
AUDIO PATH TEST TRIGGERED EXTERNALLY ....................................................................................................... 14
7.4
FAULT INDICATIONS ............................................................................................................................................ 14
7.4.1
Mains Power Fault ....................................................................................................................................... 15
7.4.2
Master Station Disabled .............................................................................................................................. 15
7.4.3
Audio Path Fault .......................................................................................................................................... 15
8
3-ZONE REFUGE EVC MAINTENANCE ........................................................................................................................ 16
8.1
ROUTINE MAINTENANCE .................................................................................................................................... 16
8.1.1
Standby Batteries ........................................................................................................................................ 16
8.2
VISUAL INSPECTION ............................................................................................................................................ 16
8.2.1
Outstations .................................................................................................................................................. 16
8.2.2
Master Station ............................................................................................................................................. 16
8.2.3
Controller / PSU / Cables ............................................................................................................................. 17
8.3
FUNCTIONAL TESTING ......................................................................................................................................... 17
8.3.1
User Call Check ............................................................................................................................................ 17
8.3.2
Operator Call Check ..................................................................................................................................... 17
8.3.3
All Call Check................................................................................................................................................ 17
8.3.4
Standby Operation Test ............................................................................................................................... 17
8.3.5
Standby Time Test ....................................................................................................................................... 18
8.3.6
Audio Path Test Check ................................................................................................................................. 18
8.3.7
Automatic Audio Path Testing ..................................................................................................................... 18
9
APPENDIX A FIRETUF CABLES .................................................................................................................................... 19
FIGURES
Figure 1 Typical 3-Zone System .............................................................................................................. 3
Figure 2 Typical 3-Zone Outstation Connection ..................................................................................... 4
Figure 3 Typical 3-Zone Outstation with Induction Loop Connection .................................................... 5
Figure 4 Typical 3-Zone Master Connection ........................................................................................... 6
Figure 5 Master Station PCB ................................................................................................................... 7
Figure 6 Master Station Panel ................................................................................................................. 9
Figure 7 Example Outstations ............................................................................................................... 12