6
OWNER’S MANUAL
INSTALLATION
NOTE:
Do not drill mounting holes in fog head enclosure. It is
designed to be air tight.
1.
Mount enclosure
where desired with screws or bolts and mounting tabs
provided. If you plan to use 3/16” ID tubing for the liquid feed, apply teflon
tape to hose barb and screw tightly into fitting on bottom of enclosure. If you
plan to use a flare or compression fitting, install the appropriate 1/8” NPT
adapter.
2. Mount vortex nozzles
to the sides of the unit. Slide the nozzler onto the
receptacle on each side. Adjust nozzle to desired direction. To adjust, loosen
clamp around nozzle and rotate union. Tighten all band clamps. Insert gray
liquid connector into side of box.
3.
Test operation.
Make sure POWER switch is OFF and CONTROL switch is
set to PRESSURE. Plug unit into a 15A grounded receptacle. Turn POWER
switch ON and CONTROL switch to MANUAL. Yellow lamp (Low Fan
Pressure) flashes momentarily and unit turns on (green light steady). Reset
CONTROL to PRESSURE and POWER to OFF.
4. Connect liquid
feed line to inlet and secure to hose barb with spring
clip.
5. Attach inlet air collar
to clean air duct and tighten clamp.
6
.
Open metering valve
and pressurize liquid line. Turn POWER ON and
CONTROL to PRESSURE. Observe fog and adjust metering valve for desired
liquid droplet size.
7.
Set timers or control devices
and fine-tune as required.
Power
Metering Valve
Liquid inlet
Pressure sensor
tubing
Air plenum
Control