The
Scheduler button
activates the project scheduler. Click on the Scheduler button to open up the
Schedule folder on the PC and enable use of the project scheduler. If no schedule files (
. CFG
) exist in the
schedule folder you will need to transfer them from the FireWriter to the schedule folder on the PC.
The
Edit Scheduler
button is used to load a FIREWRITER scheduler into the project scheduler. Highlight
a schedule in the Schedule folder on the PC and click on Edit Scheduler. With the schedule loaded you can
now modify the individual fields.
12