Page 3 of 6 | 05182015
User Manual: Portable Mist Units | English
READ ALL INSTRUCTIONS BEFORE OPERATING EQUIPMENT
Model No.: MU-10N-3, MU-10NK-3, MU-10NV-3
Assembly Instructions
1. Remove all components from packaging.
2. Attach the mist nozzle assembly to the top of the mist
mast using the screw provided in the parts package. The
mist nozzles (PFN-N130) should point upwards.
3. Push one end of the red tube into the fitting labeled “RED”
on the unit’s back plate.
4. Push one end of the blue tube into the fitting labeled
“BLUE” on the unit’s back plate.
5. Connect the other ends of the red and blue tubes to
the mist nozzle assembly. Locate the two tee fittings
(QFT38) with an open port and connect the solution line
(red) to the liquid tee and the air line (blue) to the air
tee. To determine which tee is air and which is liquid,
trace the clear tubing from the tee to one of the mist
nozzles (PFN-130) – on the body of the nozzle, the air
line is labeled “AIR” and the liquid line is labeled “LIQ.”
Note: Make sure to insert the tubing all the way into the
fittings to ensure proper connection.
Operation Instructions
Wearing all PPE and observing all safety precautions dictated by
the SDS for your chemical:
1. Fill the tank with the desired amount of solution.
2. Place the unit in the area to be misted.
3. Adjust the mist mast to the desired height. To
change the height, loosen the collar screws,
move the mast up or down as needed, then
retighten the collar screws to secure the mast.
Caution: To prevent injury from collapsing mast, always
support the mast when adjusting height. Always make
sure the collar screws are tight and secure before letting
go of the mast.
4. Ensure the air supply valve (BVB14) is in the closed
position, and connect a compressed air line to the air inlet
fitting (AP25).
5. Open the air supply valve (BVB14) to activate the unit.
6. Evacuate the area.
7. After the unit has stopped misting, observe all appropriate
safety precautions before reentering area. Close the air
supply valve (BVB14) and disconnect the compressed air
line from the unit.
8. Before moving the unit, always lower the mist mast
completely and secure it in the lowest position.