FNW 4348737 Скачать руководство пользователя страница 12

FNW.COM

©2021 Ferguson Enterprises, LLC  0721 2945816

We reserve the right to modify or improve the designs or 

specifications of our products at any time without notice.

HIGH PERFORMANCE BUTTERFLY VALVE

FIGURE HPA

12

8.5.8  Close the valve completely and remove operator 

unit. Unscrew the lever lock bolt. Lift the lever by 

pressing the latch of the lever out of the stem in 

case of hand lever operated valve.

8.5.9  Disconnect supply source and remove the 

pneumatic/electric/hydraulic actuator unit. Do 

not remove a spring return actuator unless a 

stop-screw is carrying spring force. Lift the gear 

operator out of the stem by removing the bolts in 

case of gear operated valve.

8.5.10  Secure body in a suitable clamping device without 

damaging it.

8.5.11  Remove all retainer screws (9) and remove the 

seat retainer (5).

8.5.12  Remove the seat (04) and replace it.
8.5.13  Remove counter sunk screws (24) and mounting 

plate (23) on wafer and lug valve sizes above 

12" (see 9 B). For double flange type (see 9 C), 

remove hex bolts (23), spring washers (25) and 

bracket (23).

8.5.14  Remove the hex nuts (17) and Belleville washer 

(16) from gland flange (17) and remove the 

gland flange(14). The studs (15) do not have to 

be removed.

8.5.15  Remove the wedge pin welds by grinding or 

machining off the welds and remove the wedge 

pin (8).

8.5.16  Remove the stem retainer (snap ring) (13) and pull 

the stem (3) out and remove the disc spacers (6), 

gland (12) gland packing (11).

8.5.17  Gently pull the disc (2) from the body (1).
8.5.18  Remove the bottom flange bolt (21), spring 

washers (20) and remove the bottom cover (19).

8.5.19  Remove the bottom gasket (18).
8.5.20 Remove top bearings (7) either from top of the 

valve or the waterway.

8.5.21  Remove the bottom bearings (7).

8.6  REPAIR OF COMPONENTS

8.6.1  The metallic parts should be cleaned.
8.6.2  After cleaning components, examine for damaged 

parts. Ensure that there are no scoring marks on 

the metallic sealing surfaces. Check the seals for 

scratches/wear.

8.6.3  Replace the damaged parts. The parts such 

as seats and stem packing bearings are 

recommended to be replaced with new ones 

whenever the valve is disassembled.

8.7  ASSEMBLY PROCEDURE

8.7.1  Inspect and clean all parts to make sure they 

are free of dust, grit or other material. A new 

set of gasket and seals shall be used once 

the valve is disassembled. Refer to Section 9 

for recommended spare parts. Replace any 

damaged parts.

8.7.2  Before assembly, visually inspect all the valve 

components for damage. Look for damage to the 

seating areas on the disc and check parts as per 

bill of material.

8.7.3  Apply rust preventative oil to parts, wherever 

applicable (i.e., body and disc stem bore in case of 

CS material).

8.7.4  Place the body (1) on a clean work surface. Install 

the bearings (7) with the help of mandrill into 

the upper stem bore and lower stem bore of the 

body. Refer to 9A, 9B, 9C for quantity of bearings 

required for each construction.

8.7.5  Place the cover gasket (18) from bottom side.
8.7.6  Assemble bottom cover (19) and fasten the bolts 

(21) with spring washers (20) of bottom cover.

8.7.7  For smooth assembly of the stem (3) into the disc 

(2), it may be necessary to coat the stem (3) and 

disc bore lightly with a lubricant compatible with 

the media to be handled by the valve.

CAUTION:

 •

Before removal of the valve, ensure that the line is fully depressurized.

 •

Improper handling may cause disc damage or deformation of stem or seat, which will affect sealing and 

operational torque of the valve.

 •

Ensure that the disassembled components are kept in a clean place so that there will be no damage to 

the components.

Содержание 4348737

Страница 1: ...to the needs of the end user FNW has built a product offering with an innovative approach to the market and has continued to grow its product range to meet those needs If you do not see the type or s...

Страница 2: ...ng limitations Exceeding the pressure temperature rating limitations marked on the valve may result in significant damage to the valve and personal injury Users of these valves should ensure that the...

Страница 3: ...before the valves are stored as dry contaminants like dust sand grit etc can scratch the metal seating surfaces and the soft inserts leading to leakages on full pressure operation 3 2 2 Valves shall b...

Страница 4: ...representative for assistance before installing the valve 4 1 2 Check valve for any damage and check condition of end protectors Upon discovery of any damage contact an FNW or manufacturer representa...

Страница 5: ...improper alignment of the pipe and the valve during installation can lead to unbalanced tightening of the flanges which may cause excessive stress on the bolts and lead to leakage Ensure all nuts flan...

Страница 6: ...hanical stoppers if required Worm gear operators are packed with grease Normally the grease is suitable for 20 C 4 F to 80 C 176 F For other applications consult the nearest FNW or manufacturer repres...

Страница 7: ...vide a fire safe metal sealing Valves are tested to meet the fire safety requirements of international standards according to either API 607 CAUTION Apply gradual force on the handwheel of the gear op...

Страница 8: ...ire Safe 4 Stem Soft Seat Stem Fire Seat 5 Seat Retaining Ring 6 Disc Spacer 7 Bearing Soft Seat Bearing Fire Safe 8 Wedge Pin 9 Retainer Screw 10 Packing Spacer Item Description 11 Gland Packing Soft...

Страница 9: ...Safe 4 Stem Soft Seat Stem Fire Seat 5 Seat Retaining Ring 6 Disc Spacer 7 Bearing Soft Seat 8 Wedge Pin 9 Retainer Screw 10 Packing Spacer 11 Gland Packing Soft Seat 12 Gland Packing Fire Safe Item...

Страница 10: ...if found loose 8 1 5 Gland nuts and bolts to be inspected and ensured that they are intact and not loosened during service Properly tighten the nuts by means of spanner or wrench if found loose Over t...

Страница 11: ...o repair shop 8 5 6 Before disassembly cycle open and close the valve several times to clear it of fluid then flush with water 8 5 7 Valve shall be positioned vertically by resting body side flange on...

Страница 12: ...1 Remove the bottom bearings 7 8 6 REPAIR OF COMPONENTS 8 6 1 The metallic parts should be cleaned 8 6 2 After cleaning components examine for damaged parts Ensure that there are no scoring marks on t...

Страница 13: ...and set disc in closed position 8 7 17 Disc pins to be Tig spot welded after leakage testing 8 7 18 When the gear operator or hand lever or actuator is reassembled on the valve it may be necessary to...

Страница 14: ...t during cycling CAUTION All equipment must be fitted only with manufacturer s original spare parts When ordering for spare parts always convey the following information size of valve sr no and mfg da...

Страница 15: ...PENDIX A TECHNICAL INFORMATION A1 References Design pressure temperature ratings API 609 Butterfly Valves Lug and wafer type ASME B 16 34 Valves flanged threaded and welding ends Face to face dimensio...

Страница 16: ...rties 2 Excellent chemical resistance 3 Good temperature and pressure capabilities 4 Excellent abrasion resistant Resistance to most of the chemicals and solvents Table 4 Seat temperature range and ge...

Отзывы: