background image

www.fmiproducts.com

55511F

4

FIREBOX INSTALLATION

Figure 2 - Common Location of Fireplace

0,1,080&/($5$1&(72
&20%867,%/(6

%DFNDQGVLGHVRI¿UHER[

PLQ

Adjacent wall 

12" min.

Chimney outer pipe surfaces 

2" min.

%RWWRPRI¿UHER[WRÀRRU

PLQ

 :$51,1* 'R QRW EORFN

UHTXLUHG DLU VSDFHV ZLWK LQVX

-

lation  or  any  other  material. 

'RQRWREVWUXFWHIIHFWLYHRSHQ

-

LQJRI¿UHER[ZLWKDQ\W\SHRI
IDFLQJ PDWHULDO &RPEXVWLEOH

material must not be in contact 

ZLWKEODFNIURQWIDFHRI¿UHER[

 

*

7KH HIIHFWLYH RSHQLQJ LV FRQVLGHUHG

the  opening  where  actual  heat  output 
may occur.)

0$17(/&/($5$1&(6

Woodwork  such  as  wood  trims,  mantels  or 
any other combustible material projecting from 
the front face must not be placed within 9" of 

¿UHER[HIIHFWLYHRSHQLQJ

Combustible materials above and projecting 
more  than  1 

1

/

2

 IURP WKH ¿UHER[ IURQW IDFH

(see Figure 4, page 5) must not be placed less 

WKDQIURPHIIHFWLYHRSHQLQJRIWKH¿UHER[

(NFPA STD 211, Sec. 7-3.3.3).
Mantels  or  any  other  combustible  material 
may  also  come  up  to  the  side  edge  of  the 

EODFN PHWDO IDFH RI WKH ¿UHER[ RQO\ LI WKH

projection from the front face falls within limits 
shown in Figure 5, page 5.

Spacers on Sides of 
Fireplace Provide 
Required 1" (2.5cm) 
Clearance

2" (5cm) Min. Clearance
From Pipe to 
Combustibles

3" (7.6cm)

12" (30.4cm) Min. From Perpendicular 
Side Wall to Fireplace Opening (Typ.)

Figure 3 - Firebox Clearances

Existing Wall

Projected Wall

FPWR

Perpendicular Wall

6(/(&7,1*/2&$7,21

7R GHWHUPLQH WKH VDIHVW DQG PRVW HI¿FLHQW
ORFDWLRQ IRU WKH ¿UHER[ \RX PXVW WDNH LQWR

consideration the following guidelines:
1.  The location must allow for proper clear-

ances.

2.  Consider a location where the heat output 

will not be affected by drafts, air condition-
ing ducts, windows or doors.

3.  A  location  that  avoids  the  cutting  of 

joists or roof rafters will make installation 
easier.

4.  If an outside air kit is to be installed, ac-

cessibility to outside combustion air must 
be considered. This can also be achieved 
through  a  vented  crawl  space  in  some 
cases  (see 

Optional  Outside Air  Kit

  on 

page 6).

 'RQRWFRQQHFWWKLV¿UHER[WRDFKLPQH\

system  other  than  a  FMI  PRODUCTS, 
LLC chimney system.

6.  Install in an area providing ventilation and 

adequate combustion air.

7.  Due to high temperatures, do not locate 

WKLV ¿UHER[ LQ KLJK WUDI¿F DUHDV RU QHDU

furniture or draperies.

8.  Provide  adequate  clearances  around 

air  openings  into  combustion  chamber. 

1(9(5REVWUXFWIURQWRSHQLQJRI¿UHER[
RUÀRZRIFRPEXVWLRQDQGYHQWLODWLRQDLU

9.  Do not locate in or near an area where 

JDVROLQHRURWKHUÀDPPDEOHOLTXLGVPD\
EHVWRUHG7KH¿UHER[DUHDPXVWEHNHSW

clear  and  free  from  these  combustible 
materials.

7KHW\SLFDOLQVWDOODWLRQIRUWKLV¿UHSODFHLVD

projected installation which allows you to ex-

WHQGWKH¿UHSODFHDQ\GLVWDQFHLQWRWKHURRP

A projection may be ideal for a new addition 

RQDQH[LVWLQJ¿QLVKHGZDOO

Содержание THE WINDSOR 368 ST

Страница 1: ...URYHG WR 16 Z21 60 Z21 84 standards or for use with a vent free gas ORJ KHDWHU DSSURYHG WR 16 VWDQGDUG 7KLV ZRRG EXUQLQJ UHER FRPSOLHV ZLWK 8 1 8 6 6 0 VWDQGDUG DV D 725 8 7 33 1 DQG LV OLVWHG DQG WHV...

Страница 2: ...ER XQ less the manufacturer s instruc WLRQV ZLWK WKH LQVHUW VSHFL FDOO VWDWH WKLV UHER KDV EHHQ WHVWHG for use with the insert 7KLV UHER LV QRW LQWHQGHG WR EH usedasasubstituteforafurnace WR KHDW DQ H...

Страница 3: ...stir the logs while they are burn LQJ 8VH RQO UH ORJV WKDW KDYH beenevaluatedfortheapplication LQ UHSODFH DQG UHIHU WR UH ORJ warnings and caution markings on packaging prior to use 51 1 KLOGUHQ DQG D...

Страница 4: ...Figure 3 Firebox Clearances Existing Wall Projected Wall FP WR Perpendicular Wall 6 7 1 2 7 21 7R GHWHUPLQH WKH VDIHVW DQG PRVW HI FLHQW ORFDWLRQ IRU WKH UHER RX PXVW WDNH LQWR consideration the follo...

Страница 5: ...tal Front Face 2 3 4 Max 6 98 cm 5 0 1 UDPH WKH RSHQLQJ IRU WKH UHER XVLQJ the dimensions shown in Figures 6 and 7 depending on your installation I UHER LV WR EH LQVWDOOHG GLUHFWO RQ carpeting tile ot...

Страница 6: ...earth Extension Z Type Ember Protector Noncombustible Hearth Extension Ember Protector Figure 11 Raised Hearth Extension Figure 9 Nailing Flanges Nailing Flanges Prepared Framing Nails or Screws 1 2 1...

Страница 7: ...in the required clearance between the chimney and the combustible materials KHQ SHQHWUDWLQJ D RRU RU FHLOLQJ DW DQ DQJOH XVH UHVWRS VSDFHU QXPEHU 6 0 VHH Replacement and Accessory Parts page 14 When t...

Страница 8: ...top Spacer Screws or Staples Min of 8 Existing Ceiling Frame 2 5 1cm Minimum Angled Firestop Ceiling Support Return Elbow 30 FT 9 14m 30 FT 9 14m Figure 16 Elbow Offset Return Elbow 12S 8DM Support Re...

Страница 9: ...ve the roof line use support wires to keep chimney secure Support wires may be attached to outer pipe of chimney with screws if screws do not SHQHWUDWH LQQHU XH SLSH 0 1 080 0 080 01 7 The minimum hei...

Страница 10: ...and LJXUH SDJH Figure 24 Storm Collar Chimney Pipe Waterproof Caulk Storm Collar Flashing 6 1 167 7 21 HWHUPLQH DVKLQJ WR EH XVHG ZLWK URRI RSHQ LQJ FKDUW 6OLGH DVKLQJ RYHU SLSH XQWLO EDVH LV DW DJDLQ...

Страница 11: ...HU IRU VSHFL FDWLRQV 1 6 1 5 2 QVWDOOLQJ LUHER DFLQJ Any noncombustible material may be used for facing glass tile brick etc as long as SURSHU FOHDUDQFHV DUH DGKHUHG WR DQG UHER openings are not obstr...

Страница 12: ...HFWLRQ VHH LJXUH Note Secure incoming gas line to wood IUDPLQJ WR SURYLGH ULJLGLW IRU WKUHDGHG HQG 4 Repack insulation around gas line and into sleeve opening Seal any gaps between gas line and refrac...

Страница 13: ...DWLRQ GRRUV PXVW EH IXOO RSHQ RU IXOO FORVHG SRVLWLRQ RQO RU D UH KD DUG PD EH FUHDWHG VHH LJXUH RU UHER HTXLSSHG ZLWK JODVV GRRUV RSHUDWHV PXFK GLIIHUHQWO WKDQ D UHER ZLWK DQ RSHQ IURQW UHER ZLWK JOD...

Страница 14: ...FKLOGUHQ VKRXOG EH FDUH fully supervised when they are in WKH VDPH URRP DV UHER TECHNICAL SERVICE You may have further questions about instal lation operation or troubleshooting If so contact FMI PROD...

Страница 15: ...able in triple wall 28 3 3 6833257 66 0 6 0 28 2 2 6 7 0 5 6723 63 5 6 0 for Straight 3LSH 212 723 7 50 1 7 21 7 0 7 2 0 Vent Plaster Collar Vent Hood Connector Duct 4 x 3 Return Elbow Starter Elbow 6...

Страница 16: ...55511 Rev F 67 UXVKHG UDVV 67 3ODWLQXP 3 67 ODFN REPLACEMENT AND ACCESSORY PARTS Continued 2 66 2256 6 DUERU OYG 6DQWD QD 1 866 328 4537 www fmiproducts com...

Отзывы: