22
7.3.
Haylards
1.
Please have the packs Big box/mast/ropes.
2.
Install the HK404 pulley at the bottom of the mast
3.
Insert the halyard of MS M3203 by rea, and then in the groove of the mast up to the mast
foot pulley. Block by a single knot and a stopper knot.
4.
Get the spi SP1305 halyard through the cleat at the bottom of the mast. Mount the halyard
until the HK2148 pulley then get it back down at the bottom of the mast (see next page
plan).
5.
For the strop of jib, make a
lark’s
head knot between M3406 rope and the pulley H404 (see
below), attach the other end to the hound using
a lork’s head knot
. Tape to fix to the
forestay (see picture)
6.
Tape to the level of the forestay.
7.
Get the TG1014 jib halyard through the pulley HK404 on the strop of jib. Hang the shackle
WD1201 on the lower part of the halyard and a HK404 pulley at the other end of the halyard.
Make a bowline with the TG1101 guide to the HK404 pulley, take it down at the bottom of
the forestay and hitch it.
MAST
Содержание Essentiel
Страница 1: ...ASSEMBLING MANUAL...
Страница 4: ...4 2 Overview OVERVIEW...
Страница 5: ...5 OVERVIEW...
Страница 16: ...16 15 Install Main Sail tackle using the trailor axis PLATFORM...
Страница 17: ...17 6 3 Platform Ropes Plan PLATFORM...
Страница 23: ...23 MAST MAST...
Страница 24: ...24 MAST...
Страница 27: ...27 MAST...
Страница 29: ...29 BOWSPRIT...